Project ID: 100

Chinese Government provides RMB 100 million interest-free loan for Gotera Interchange Construction Project

Commitment amount

$ 22119295.3

Constant 2017 USD

Summary

Funding agency [Type]

China Ministry of Commerce [Government Agency]

Recipient

Ethiopia

Sector

Transport and storage (Code: 210)

Flow type

Loan

Concessional

Yes

Category

Intent

Development (The next section lists the possible statuses.)

Commercial

Development

Representational

Mixed

Financial Flow Classification

ODA-like (The next section lists the possible statuses.)

Official Development Assistance

Other Official Flows

Vague (Official Finance)

Flows categorized based on OECD-DAC guidelines

Project lifecycle

Status

Completion (The next section lists the possible statuses.)

Pledge

Commitment

Implementation

Completion

Suspended

Cancelled

Milestones

Commitment year

2006

Implementation

2007

2007-06-28

Actual start

Completion

2009

2009-05-31

Actual

Geography

Description

In 2006, the Chinese Government and the Government of Ethiopia signed an RMB 100 million interest-free loan agreement for the Gotera Interchange Construction Project.The groundbreaking ceremony was held on December 18, 2006. Construction began on June 28, 2007, and was completed on May 31, 2009 (see 'Speech by H.E. Ambassador Gu Xiaojie at the Inauguration Ceremony of the Gotera Interchange(May 31st, 2009)'). The project was designed by China Hydropower Consulting Group East China Survey and Design Institute. Construction was carried out by the Shanghai Construction Engineering Group Corporation. Construction was overseen by Guangzhou Wanan Construction Supervision Co., Ltd.(see '援埃塞俄比亚格特拉立交桥项目施工技术资料完成移交'). The interchange is 8,281 meters long with an approach bridge and was the first interchange of Addis Ababa Ring Road (see 'CHINA’S AID IN AFRICAN URBAN DEVELOPMENT').

Additional details

The Chinese project title is 埃塞俄比亚首都环城路格特拉立交桥 or GOTERA立交桥项目. This loan is omitted from database of Chinese loan commitments that SAIS-CARI released in July 2020. Since loan terms for the interest-free loan are unavailable, AidData has set maturity period to 20 years by default and grace period to 10 years by default per China's Foreign Assistance White Paper (http://www.cidca.gov.cn/2018-08/06/c_129925064_3.htm) which states that the maturity period of interest-free loans is 20 years, with a drawdown period of 5 years, grace period of 5 years, and repayment over 10 years. AidData treats the drawdown period as providing 5 years of additional grace.

Number of official sources

8

Number of unofficial sources

8

Download the dataset

Details

Cofinanced

No

Receiving agencies [Type]

Government of Ethiopia [Government Agency]

Implementing agencies [Type]

China Hydropower Engineering Consulting Group Co./China Hydropower Engineering Consulting Group Kunming Survey and Design Institute [Private Sector]; Government of Ethiopia [Government Agency]; Guangzhou Wanan Construction Supervision, Co. Ltd. [State-owned Company]; Shanghai Construction Group General Co. [State-owned Company]

Loan type

Interest-Free

Maturity

20 years

Interest rate

0.0%

Grace period

10 years

Grant element

75.05159755%

Gurarantee provided

No

Insurance provided

No