Narrative
Full Description
Project narrative
On September 8, 2022, the Chinese Embassy in Botswana granted BWP 415,000 to refurbish the Molepolole Kgotla Shelter in Botswana. The project will be conducted by a Molepolole-based businessman and is expected to take 6 weeks. Details of refurbishment include replacing thatches, installing supporting rafters, and establishing electricity connection. It is seen as a demonstration of the cordial relationship between Botswana and China. The project was completed on March 5, 2023. A handover ceremony was held for this donation. Member of Parliament for Molepolole South, Kabo Morwaeng, and China’s Ambassador to Botswana, Wang Xuefeng, attended the ceremony.