China Eximbank provides $85.9 million preferential buyer’s credit for Phase 8 of Rural Grid Extension Project (Linked to Record ID#32216, #62326, #62331, #62333, #92545)

Commitments (Constant USD, 2023)$85,956,000
Commitment Year2023Country of ActivityCambodiaDirect Recipient Country of IncorporationCambodiaSectorEnergyFlow TypeLoan

Status

Project lifecycle

Pipeline: Commitment

Pipeline: PledgePipeline: CommitmentImplementationCompletion

Timeline

Key dates

Commitment date
Oct 17, 2023
Start (planned)
Jan 1, 2023
End (planned)
Dec 31, 2026
First repayment (originally scheduled)
Oct 15, 2030
Last repayment (originally scheduled)
Oct 12, 2043

Geospatial footprint

Map overview

Visualizes the AidData-provided feature geometry for this project.

Loading map…

The purpose of the project is to build 3,085 kilometers of 22 kV and 35 kV medium-voltage lines and install 635 pole-mounted transformer switchgear in Takeo, Pursat, Kampong Cham, Tbong Khmum, Otdar Meanchey, Kampong Thom, Battambang, Koh Kong, Banteay Meanchey, Siem Reap, Pailin, Preah Vihear, Kampong Speu, Kampong Chhnang, Prey Veng, Stung Treng, Mondul Kiri, Ratanakiri, Kratie, Svay Rieng, Preah Sihanouk. More detailed locational information can be found at https://www.openstreetmap.org/relation/2200220, https://www.openstreetmap.org/relation/2200278, https://www.openstreetmap.org/relation/2200442, https://www.openstreetmap.org/relation/3714841, https://www.openstreetmap.org/relation/2200402, https://www.openstreetmap.org/relation/2198944, https://www.openstreetmap.org/relation/6608542, https://www.openstreetmap.org/relation/2199066, https://www.openstreetmap.org/relation/2200390, https://www.openstreetmap.org/relation/2200393, https://www.openstreetmap.org/relation/2200322, https://www.openstreetmap.org/relation/2198922, https://www.openstreetmap.org/relation/2215016, https://www.openstreetmap.org/relation/2200303, https://www.openstreetmap.org/relation/2200477, https://www.openstreetmap.org/relation/2198916, https://www.openstreetmap.org/relation/2200450, https://www.openstreetmap.org/relation/2200301, https://www.openstreetmap.org/relation/2200456, https://www.openstreetmap.org/relation/2301441, and https://www.openstreetmap.org/relation/3279394.

Stakeholders

Organizations involved in projects and activities supported by financial and in-kind transfers from Chinese government and state-owned entities

Ultimate beneficial owners

At least 25% host country ownership

Funding agencies

State-owned Policy Banks

  • Export-Import Bank of China (China Eximbank)

Receiving agencies

Government Agencies

  • Government of Cambodia

Implementing agencies

State-owned companies

  • China National Heavy Machinery Corporation (CHMC)

Loan description

China Eximbank provides $85.9 million preferential buyer’s credit for Phase 8 of Rural Grid Extension Project

Grace period7 yearsGrant element56.0077%Interest rate (t₀)2%Interest typeFixed Interest RateMaturity20 years

Narrative

Full Description

Project narrative

On October 17, 2023, China Eximbank and the Government of Cambodia signed a $85,956,000 preferential buyer’s credit (PBC) agreement for Phase 8 of the Rural Grid Extension Project. The borrowing terms of the loan include a 20-year maturity, a 7-year grace period, and a 2% interest rate. The borrower is expected to use the proceeds of the loan to finance 95% of the cost of a $90,480,000 commercial contract with China National Heavy Machinery Corporation (CHMC). The purpose of the project is to build 3,085 kilometers of 22 kV and 35 kV medium-voltage lines and install 635 pole-mounted transformer switchgear in Takeo, Pursat, Kampong Cham, Tbong Khmum, Otdar Meanchey, Kampong Thom, Battambang, Koh Kong, Banteay Meanchey, Siem Reap, Pailin, Preah Vihear, Kampong Speu, Kampong Chhnang, Prey Veng, Stung Treng, Mondul Kiri, Ratanakiri, Kratie, Svay Rieng, Preah Sihanouk. Upon completion, the project is expected to improve rural power conditions in Cambodia, increase power supply coverage and quality, reduce electricity prices in the areas involved in the project, narrow the gap between rural and urban power grid development levels, improve regional living standards, increase the number of jobs, and drive economic development in the region. CHMC is the EPC contractor responsible for project implementation. The project’s originally scheduled commencement and completion dates were January 1, 2023 and December 31, 2026, respectively.

Staff comments

1. This project is also known as the Rural Electrification Project Phase 8 Project and the Cambodian Rural Power Grid Expansion (Phase 8) Project. The Chinese project title is 柬埔寨农村电网扩建八期项目. 2. The signing of the PBC agreement took place during the third ‘One Belt, One Road’ International Cooperation Summit Forum. It was witnessed by Premier Li Qiang of the State Council and Prime Minister of Cambodia Hun Manai, Chairman of the Export-Import Bank Wu Fulin and Cambodian State Secretary of Economy and Finance Rosiva. 3. The borrowing terms of the PBC are identified here: https://www.dropbox.com/scl/fi/abzk8v0q7rt6kl3hxmzz5/ODA-Cambodia-May-2025-Record-for-Phase-8-of-Rural-Grid-Extension-Project.pdf?rlkey=kokdm1sr5hbm47tz7p70wstij&dl=0 4. The PBC that supported Phase 7 of the Rural Grid Extension Project is captured via Record ID#92545.