Overview

China Eximbank provides $58.3 million preferential buyer’s credit for National Road No. 33 Reconstruction and Upgrading Project

Commitments (Constant USD, 2023)$55,117,133
Commitment Year2022Country of ActivityCambodiaDirect Recipient Country of IncorporationCambodiaSectorTransport And StorageFlow TypeLoan

Status

Project lifecycle

Implementation

Pipeline: PledgePipeline: CommitmentImplementationCompletion

Timeline

Key dates

Commitment date
Apr 12, 2022
Start (planned)
May 1, 2022
Start (actual)
Dec 30, 2022
End (planned)
Sep 1, 2025
First repayment (originally scheduled)
Apr 10, 2029
Last repayment (originally scheduled)
Apr 7, 2042

Geospatial footprint

Map overview

Visualizes the AidData-provided feature geometry for this project.

Loading map…

The purpose of the project is to expand and upgrade National Road No. 33 (NR33), a 52.57 km road that runs from the NR3 junction near Kampot market (148km+100) to the Cambodia-Vietnam border gate (Lok or Prek Chak). The project scope includes (1) widening the body of the road to 12 meters (AC rubber concrete floor, 7 cm thick from PK0+00 to PK 36+238 and AC rubber concrete floor, 5 cm thick from PK36+238 to PK51+860) according to Chinese standards (so-called ‘Chinese Standard II’), (2) building sewers in 18 places that measure 252 meters in length, (3) building drainage in 8 places, and (4) equipping the road with speed camera in 5 places. More detailed locational information can be found at: https://www.openstreetmap.org/relation/18245777 and https://www.openstreetmap.org/relation/18250099

Stakeholders

Organizations involved in projects and activities supported by financial and in-kind transfers from Chinese government and state-owned entities

Ultimate beneficial owners

At least 25% host country ownership

Funding agencies

State-owned Policy Banks

  • Export-Import Bank of China (China Eximbank)

Receiving agencies

Government Agencies

  • Government of Cambodia

Implementing agencies

State-owned companies

  • China Road & Bridge Corporation (CRBC)
  • Guangzhou Wanan Construction Supervision, Co. Ltd.

Loan desecription

China Eximbank provides $58.3 million preferential buyer’s credit for National Road No. 33 Reconstruction and Upgrading Project

Grace period7 yearsGrant element56.0077%Interest rate (t₀)2%Interest typeFixed Interest RateMaturity20 years

Narrative

Full Description

Project narrative

On April 12, 2022, China Eximbank and the Government of Cambodia signed a $58,330,000 China Eximbank preferential buyer’s credit (PBC) agreement for the National Road No. 33 Reconstruction and Upgrading Project. The loan carries the following borrowing terms: a 2% interest rate, a 7-year grace period, and a 20-year maturity. The borrower is expected to use the proceeds of the loan to finance a commercial contract with China Road and Bridge Corporation (CRBC). During calendar years 2022 and 2023, China Eximbank disbursed $11,396,200 and $14,852,300, respectively, in support of the National Road No. 33 Reconstruction and Upgrading Project. As of early 2024, the lender planned to disburse $16,025,750 in 2024 and $16,025,750 in 2025. The purpose of the project is to expand and upgrade National Road No. 33 (NR33), a 52.57 km road that runs from the NR3 junction near Kampot market (148km+100) to the Cambodia-Vietnam border gate (Lok or Prek Chak). The project scope includes (1) widening the body of the road to 12 meters (AC rubber concrete floor, 7 cm thick from PK0+00 to PK 36+238 and AC rubber concrete floor, 5 cm thick from PK36+238 to PK51+860) according to Chinese standards (so-called ‘Chinese Standard II’), (2) building sewers in 18 places that measure 252 meters in length, (3) building drainage in 8 places, and (4) equipping the road with speed camera in 5 places. CRBC is the EPC contractor responsible for project implementation. Guangzhou Wanan Construction Supervision Co., Ltd. is responsible for project supervision. A groundbreaking ceremony took place on December 30, 2022. The project’s originally scheduled commencement and completion dates were May 1, 2022 and September 30, 2025, respectively.

Staff comments

1. The Chinese project title is 33号公路升级改造工程 or 柬埔寨31号和33号公路升级改造项目.