CDB provides loan for 735.85MW Sāo Manoel Hydroelectric Dam Project

Commitment Year2014Country of ActivityBrazilDirect Recipient Country of IncorporationBrazilSectorEnergyFlow TypeLoan

Status

Project lifecycle

Completion

Pipeline: PledgePipeline: CommitmentImplementationCompletion

Timeline

Key dates

Commitment date
Feb 1, 2014
Start (actual)
Aug 1, 2014
End (actual)
Apr 7, 2018

Geospatial footprint

Map overview

Visualizes the AidData-provided feature geometry for this project.

Loading map…

The purpose of the project, which had a total expected cost of BRL 2.7 billion ($1.13 billion), was to construct a 735.85MW hydroelectric power plant — with four generation units — on the Teles Pires River, between the States of Mato Grosso and Pará, in Brazil (exact locational coordinates: -9.1903, -57.0522). More detailed locational information can be found at https://www.openstreetmap.org/way/700595151

Stakeholders

Organizations involved in projects and activities supported by financial and in-kind transfers from Chinese government and state-owned entities

Ultimate beneficial owners

At least 25% host country ownershipAt least 25% Chinese ownership

Funding agencies

State-owned Policy Banks

  • China Development Bank (CDB)

Cofinancing agencies

State-owned Banks

  • Brazilian Development Bank (BNDES)

Receiving agencies

Joint Venture/Special Purpose Vehicles

  • São Manoel Energia S.A.

Loan description

CDB provides loan for 735.85MW Sāo Manoel Hydroelectric Dam Project

Interest typeUnknown

Narrative

Full Description

Project narrative

In February 2014, China Three Gorges Corporation (CTG) acquired a 33.33% equity stake in São Manoel Energia S.A. — the project company responsible for the 735.85MW Sāo Manoel Hydroelectric Dam Construction Project — from EDP BRASIL SA. São Manoel Energia S.A. is a special purpose vehicle and joint venture of CTG (33.33% equity stake), EDP BRASIL SA (33.334% equity stake), and Furnas Centrais Elétricas S.A. (33.333% equity stake). The project had a total expected cost of BRL 2.7 billion ($1.13 billion). To finance this, BNDES provided two major loans directly to São Manoel Energia S.A.: (1) BRL 450 million on May 26, 2015 (contract ID#15202021), and (2) BRL 1.314 billion on August 11, 2016 (contract ID#16202511). In addition, evidence indicates that the China Development Bank (CDB) also provided financing in support of the project. However, it is not clear whether CDB’s support took the form of a direct loan to São Manoel Energia S.A. or an indirect loan channeled through BNDES. The size and terms of the CDB loan have not been publicly disclosed, and further research is needed to clarify whether the CDB financing was used to (a) support CTG’s acquisition of equity in São Manoel Energia S.A. or (b) co-finance the construction of the 735.85MW hydropower plant alongside BNDES. Construction of the Sāo Manoel Hydroelectric Dam began in August 2014. Water was stored in the dam’s reservoir in October 2017. The first of four generation units was connected to the grid on December 5, 2017, and the last unit was commissioned on April 7, 2018.

Staff comments

1. The Chinese project title is 圣马诺埃尔水电站 or 圣马诺埃尔项目. 2. São Manoel Energia S.A. is also known as UHE São Manoel and Empresa de Energia São Manoel S.A. (EESM). 3. Evidence of CDB financing is provided via https://www.cdb.com.cn/xwzx/khdt/202406/t20240613_11583.html and https://app.xinhuanet.com/news/article.html?articleId=97d84cfb46b91cbbb57264e62d5a16a4 and https://www.cdb.com.cn/ep/202406/t20240613_11585.html. 4. More research is needed to determine the face value and timing of the CDB loan. 5. More research is needed to determine if the proceeds of the CDB loan were used to (a) help CTG acquire a 33.33% equity stake in São Manoel Energia S.A. or (b) support the construction of the 735.85MW Sāo Manoel hydroelectric dam. Another possibility that requires investigation is BNDES on-lending the proceeds of a CDB loan to São Manoel Energia S.A.