Skip to content

Overview

[Sino-Congolese Programme] China Eximbank provides $31.12 million loan for Phase 3 of the 55.5 km Bukavu-Nyangezi-Kamanyola-Uvira Segment of Route Nationale 5 (RN5) Construction and Modernization Project (Linked to Record ID#450, 85310, 46231)

Commitment Year2023Country of ActivityDemocratic Republic of the CongoDirect Recipient Country of IncorporationDemocratic Republic of the CongoSectorTransport And StorageFlow TypeLoan

Status

Project lifecycle

Implementation

Pipeline: PledgePipeline: CommitmentImplementationCompletion

Timeline

Key dates

Commitment date
Jan 1, 2023
Start (actual)
Jul 22, 2023
First repayment (originally scheduled)
Dec 29, 2032
Last repayment (originally scheduled)
Dec 26, 2047

Stakeholders

Organizations involved in projects and activities supported by financial and in-kind transfers from Chinese government and state-owned entities

Ultimate beneficial owners

At least 25% host country ownershipAt least 25% Chinese ownership

Funding agencies

State-owned Policy Banks

  • Export-Import Bank of China (China Eximbank)

Receiving agencies

Joint Venture/Special Purpose Vehicles

  • Sino-Congolais des Mines (Sicomines SARL)

Implementing agencies

State-owned companies

  • Sinohydro Bureau 14 CO., LTD
  • Société d'Infrastructures Sino-Congolaises (SISC) SA

Guarantors

Government Agencies

  • Government of the Democratic Republic of the Congo

Collateral providers

Joint Venture/Special Purpose Vehicles

  • Sino-Congolais des Mines (Sicomines SARL)

Loan description

[Sino-Congolese Programme] China Eximbank provides $31.12 million loan for Phase 3 of the 55.5 km Bukavu-Nyangezi-Kamanyola-Uvira Segment of Route Nationale 5 (RN5) Construction and Modernization Project

Grace period10 yearsGrant element48.1595%Interest rate (t₀)3.839%Interest typeVariable Interest RateLoan tenor6-month rateMaturity25 years

Collateral

Subsidiary (buyer's credit) loan agreements under the master loan (facility) agreement were underpinned by the following source of collateral: the mining rights and titles of SICOMINES SARL, including its rights and titles to the copper and cobalt deposits of Dikuluwe, Mashamba West, Junction D, Cuvette Dima, Cuvette Mashamba and Syncline Dikuluwe Colline D. The borrower was expected to repay the lender with revenues (export receipts) generated by a copper and cobalt mine at Kolwezi (owned by SICOMINES SARL).

Narrative

Full Description

Project narrative

In 2008, China Eximbank issued a $3.003 billion general buyer's credit loan to Sino–Congolais des Mines (Sicomines SARL) — a joint venture — to finance infrastructure projects in the DRC (as captured via Record ID#450). All subsidiary borrowings under the (government-guaranteed) general buyer's credit loan agreement were to be repaid with revenues from mining projects managed by Sicomines SARL. Each subsidiary loan carried a maturity of 25 years, a grace period of 10 years, and an interest rate of 6-month LIBOR plus a 1% margin (or 3.839% at the time of the agreement). All infrastructure projects supported through the general buyer's credit loan were part of the so-called ‘Sino-Congolese Programme.’ One of the subsidiary loans issued as part of the 'Sino-Congolese Programme' was a $31.12 million loan for Phase 3 of the 55.5 km Bukavu-Nyangezi-Kamanyola-Uvira Segment of Route Nationale 5 (RN5) Construction and Modernization Project. The project involves the construction and modernization of a 55.5 km road between the town of Bukavu and the town of Uvira in North Kivu Province. The road also connects the cities of Uvira and Kamanyola, which are border towns near Rwanda and Burundi and important areas for agricultural production. Sinohydro 14 and La Société d'infrastructures sino-congolaise (SISC S.A.) are the contractors responsible for project implementation. Their work is being supervised by Agence Congolaise des Grands Travaux (ACGT). Construction began on July 22, 2023.

Staff comments

1. The French project title is Projet de réhabilitation de la route nationale numéro 5, Travaux du Projet d'Asphaltage de la route Bukavu-Kamanyola, or Projet de Construction et Modernisation de la RN5 : Bukavu-Nyangezi-Kamanyola-Uvira/Lot3. 2. Given that AidData has captured the entire $3.003 billion China Eximbank loan commitment amount for multiple infrastructure projects via Record ID#450, it does not record a financial commitment (transaction) amount for the subsidiary loan supporting this project to avoid double-counting. 3. The China Eximbank loan commitment for Phase 1 of the 55.5 km Bukavu-Nyangezi-Kamanyola-Uvira Segment of Route Nationale 5 (RN5) Construction and Modernization Project is captured via Record ID#46231. The China Eximbank loan commitment for Phase 2 of the 55.5 km Bukavu-Nyangezi-Kamanyola-Uvira Segment of Route Nationale 5 (RN5) Construction and Modernization Project is captured via Record ID#85310.