Narrative
Full Description
Project narrative
In 2006, China Eximbank agreed to provide $81 million export seller's credit to China Machinery Engineering Corporation (CMEC) for the 340 km Rabak-El-Obeid Transmission Line Construction Project. The proceeds of the loan of the loan were to be use to cover 100% of the cost of a commercial contract signed on May 11, 2006 by China Machinery Engineering Corporation (CMEC) and the Sudan National Electricity Corporation (NEC). The borrowing terms of the loan are unknown. The project involved the construction of a 340km, 220kV electricity transmission line from Rabak (ربك), a city in southeastern Sudan, to the city of El-Obeid in central Sudan within North Kordofan State. It also involved the installation of a 220/33/11kv transformer station in El-Obeid. Construction began in 2006 and ended in 2009; however, a 2011 publication by Dr. Samai Satti Osman Mohamed Nour describes the project as '95% complete.'
Staff comments
1. This project is also called the Rabak-Obeid Third Circuit Elroseires-Khartoum Electricity Project or National Electricity Corporation Transition Line Project. The Chinese project title is 苏丹拉巴克至奥拜易德输变电线路项目. 2. This project is part of a larger initiative called the White Nile Grid Project (captured via Record ID#67168).