Project ID: 28218

CEEC provides $22 million supplier's credit for 9.8MW Mabubas Hydropower Project Expansion Project (linked to #34788, #34827)

Commitment amount

$ 25830718.27436859

Adjusted commitment amount

$ 25830718.27

Constant 2021 USD

Summary

Funding agency [Type]

China Energy Engineering Group Co., Ltd. (CEEC) [State-owned Company]

Recipient

Angola

Sector

Energy (Code: 230)

Flow type

Loan

Level of public liability

Central government debt

Infrastructure

Yes

Category

Intent

Mixed (The next section lists the possible statuses.)

Commercial

Development

Representational

Mixed

Financial Flow Classification

OOF-like (The next section lists the possible statuses.)

Official Development Assistance

Other Official Flows

Vague (Official Finance)

Flows categorized based on OECD-DAC guidelines

Project lifecycle

Status

Completion (The next section lists the possible statuses.)

Pledge

Commitment

Implementation

Completion

Suspended

Cancelled

Milestones

Commitment

2012-01-01

Actual start

2009-07-01

Actual complete

2012-05-14

Geography

Description

In 2012, China Energy Engineering Corporation (CEEC) — a Chinese state-owned enterprise — provided a $22 million supplier's credit to the Government of Angola for the 10MW Mabubas Hydropower Project Expansion Project. The borrowing terms of this loan are unknown. The project involved an expansion in the capacity of the Mabubas hydroelectric dam in Bengo Province from 17MW to 26.8MW. CEEC and Guangxi Hydroelectric Construction Bureau (GHCB) were the contractors responsible for implementation. Construction began in July 2009; and the the dam was reopened on 14 May, 2012. In 2005, China Eximbank provided a $13.13 million buyer’s credit loan (BCL) for the 60kv Quifangondo-Mabubas Transmission Line and Substation Reconstruction Project (see Project #34788) as well as a $20.613 million BCL from 2007 for the Caxito Electricity Network (MT, BT, and IP) Rehabilitation and Expansion and 60Kv Quifangondo-Cazenga Transmission Line Rehabilitation Project (see Project #34827).

Additional details

Number of official sources

1

Number of total sources

6

Download the dataset

Details

Cofinanced

No

Direct receiving agencies [Type]

Government of Angola [Government Agency]

Implementing agencies [Type]

Guangxi Hydroelectric Construction Bureau (GHCB) [State-owned Company]

China Energy Engineering Group Co., Ltd. (CEEC) [State-owned Company]

Loan Details

Bilateral loan

Investment project loan

Supplier's credit/Export seller's credit