Chinese Government provides RMB 24 million interest-free loan — via ETCA — for Mao Tse Toung Boulevard Resurfacing Project (Linked to Record ID#32025)

Commitments (Constant USD, 2023)$6,693,962
Commitment Year2002Country of ActivityCambodiaDirect Recipient Country of IncorporationCambodiaSectorTransport And StorageFlow TypeLoan

Status

Project lifecycle

Completion

Pipeline: PledgePipeline: CommitmentImplementationCompletion

Timeline

Key dates

Commitment date
Feb 20, 2002
Start (actual)
Oct 4, 2002
End (actual)
Apr 25, 2003
First repayment
Dec 30, 2011
Last repayment
Dec 27, 2021

Geospatial footprint

Map overview

Visualizes the AidData-provided feature geometry for this project.

Loading map…

The purpose of the project was to resurface 5.1 kilometers of Mao Tse Toung in the capital city of Phnom Penh. It also involved repairs to footpaths, signs and road markings, traffic signals, and the drainage system of Mao Tse Toung Boulevard. More detailed locational information can be found at https://www.openstreetmap.org/way/857957132

Stakeholders

Organizations involved in projects and activities supported by financial and in-kind transfers from Chinese government and state-owned entities

Ultimate beneficial owners

At least 25% host country ownership

Funding agencies

Government Agencies

  • China Ministry of Commerce

Receiving agencies

Government Agencies

  • Government of Cambodia

Implementing agencies

State-owned companies

  • China Geo-Engineering Corporation (CGC)

Loan desecription

Chinese Government provides RMB 24 million interest-free loan — via ETCA — for Mao Tse Toung Boulevard Resurfacing Project

Grace period10 yearsGrant element75.0516%Interest rate (t₀)0%Interest typeFixed Interest RateMaturity20 years

Narrative

Full Description

Project narrative

On February 20, 2002. the Chinese Government and the Government of Cambodia signed an exchange of letters regarding an RMB 24 million interest-free loan for the Mao Tse Toung Boulevard Resurfacing Project. The loan proceeds were drawn from an economic and technical cooperation agreement (ETCA) that the parties signed on December 24, 2001 (see Record ID#32025). The purpose of the project was to resurface 5.1 km of Mao Tse Toung Boulevard in the capital city of Phnom Penh. It also involved repairs to footpaths, signs and road markings, traffic signals, and the drainage system of Mao Zedong Boulevard. China Geo-Engineering Corporation was the contractor responsible for implementation. The project commenced on October 4, 2002 and ended on April 25, 2003.

Staff comments

1. This project is also known as the Repairing the Surface of Mao Tsetung Blvd. Project or the Mao Zedong Boulevard Resurfacing Project. 2. Since the borrowing terms of the interest-free loan are unavailable, AidData has set maturity= to 20 years by default and grace period to 10 years by default, per China's Foreign Assistance White Paper (http://www.cidca.gov.cn/2018-08/06/c_129925064_3.htm) which states that the maturity of interest-free loans is 20 years, with a drawdown period of 5 years, grace period of 5 years, and repayment over 10 years. AidData treats the drawdown period as providing 5 years of additional grace.