Narrative
Full Description
Project narrative
In February 2000, China and Nepal exchanged letters regarding technical aid to Nepal Television, specifically the construction of the Nepal Television Metro Channel studio building and transmission tower. (Another source stated that an agreement had been reached between China and Nepal in 1998 for expansion and development of Nepal Television.) In 2002, Minister for Information and Communications Jaya Prakash Prasad Gupta laid the foundation stone of Nepal Television Metro Channel studio building and transmission tower which is to be constructed with cooperation from China. The project, with an estimated cost of about 520m rupees, is expected to be completed within a year. The entire construction works of the project will be undertaken by Chinese technicians. In October 2004, Metro Channel of Nepal Television (NTV)'s newly constructed transmission building that was funded by China's grant assistance was handed over to NTV. The building, constructed under the Nepal Television Improvement and Development project, is situated in the premises of NTV, Singhadurbar covering an area of 3876 square metres. The construction took 15 months to complete.