Chinese Government provides RMB 80 million for Nouakchott Stormwater Drainage System Construction Project (Linked to Record ID#53448 and Record ID#56911)

Commitments (Constant USD, 2023)$13,315,613
Commitment Year2014Country of ActivityMauritaniaDirect Recipient Country of IncorporationMauritaniaSectorWater Supply And SanitationFlow TypeVague TBD

Status

Project lifecycle

Completion

Pipeline: PledgePipeline: CommitmentImplementationCompletion

Timeline

Key dates

Commitment date
Jan 1, 2014
Start (actual)
Nov 23, 2015
End (actual)
Nov 30, 2018

Geospatial footprint

Map overview

Visualizes the AidData-provided feature geometry for this project.

Loading map…

This project involved the construction of a concrete rainwater collection culvert with a total length of 31.5 kilometers, a reinforced steel rainwater pipeline of 13.6 kilometers, and four rainwater pumps in the low-lying areas of Nouakchott (specifically, Ksar, Tevragh-Zeina, El Mina and Sabkha). Its ultimate purpose was to solve the problems of stagnant water in low-lying areas and waterlogging in the rainy season. More detailed location information can be found at: https://www.openstreetmap.org/relation/3395130

Stakeholders

Organizations involved in projects and activities supported by financial and in-kind transfers from Chinese government and state-owned entities

Funding agencies

Government Agencies

  • China Ministry of Commerce

Receiving agencies

Government Agencies

  • Government of Mauritania

Implementing agencies

State-owned companies

  • China Tiesiju Civil Engineering Group Co., Ltd.

Loan desecription

Chinese Government provides RMB 80 million for Nouakchott Stormwater Drainage System Construction Project (Linked to Record ID#53448 and Record ID#56911)

Narrative

Full Description

Project narrative

According to the Government of Mauritania’s Development Assistance Database (DAD), the Chinese Government and the Government of Mauritania signed an Economic and Technical Cooperation Agreement (ETCA) on January 1, 2015 which committed an RMB 100 million loan for the Nouakchott Stormwater Drainage System Construction Project. This loan carried the following terms: 20 year maturity, 10 year grace period, and 0% interest rate. The Chinese Government also provided an RMB 100 million grant — through an ETCA that was signed on December 17, 2014 — to support this project. The total cost of the Nouakchott Stormwater Drainage System Construction Project was RMB 280 million and the Chinese Government fully financed the project. However, it is not known if the remaining RMB 80 million was covered through a Chinese Government grant, loan, or some combination of the two. Record ID#53448 captures the RMB 100 million interest-free loan. Record ID#56911 captures the RMB 100 million grant. Record ID#36190 captures the residual RMB 80 million. This project involved the construction of a concrete rainwater collection culvert with a total length of 31.5 kilometers, a reinforced steel rainwater pipeline of 13.6 kilometers, and four rainwater pumps in the low-lying areas of Nouakchott (specifically, Ksar, Tevragh-Zeina, El Mina and Sabkha). Its ultimate purpose was to solve the problems of stagnant water in low-lying areas and waterlogging in the rainy season. China Tiesiju Civil Engineering Group Co., Ltd. (CTCE Group), which is also known as China Railway Fourth Group Co. (CREC4), is the contractor responsible for implementation. Upon completion, it was envisaged that this stormwater drainage system would allow pumping of a total quantity of 225,000 m3 per day, allowing the absorption of precipitation of 50 mm in less than 5 hours. Construction began on November 23, 2015. On November 30, 2018, the completion ceremony was held in Nouakchott. On January 29, 2019, the project was officially handed over to the local authorities in Mauritania.

Staff comments

1. This project is also known as the Nouakchott Rain Water Evacuation Network Project. The Chinese project title is 努瓦克肖特城市排水工程雨水系统项目 or 援毛塔首都低洼地区雨水排放项目 or 援毛塔首都低洼地区雨水排放项目 or 中国援助毛里塔尼亚首都排水工程雨水系统. The French project title is le projet d'assainissement or Projet d’Assainissement de la ville de Nouakchott (CPAN) or Projet d'assainissement de Nouakchott or Projet réseau assainissement de la ville de Nouakchott. 2. AidData does not yet know precisely how much funding was provided as a grant and how much was provided through an interest-free loan. This issue merits further investigation. 3. The flow_class field is set to ODA-Like because the project has development intent and grants and interest-free loans from MOFCOM always exceed the OECD concessionality threshold of 25%.