Project ID: 37646

China Eximbank provides RMB 440 million government concessional loan for Nuku'alofa Central Business District (CBD) Reconstruction Project (Linked to Project ID#64926, #73428)

Commitment amount

$ 104082807.1220411

Adjusted commitment amount

$ 104082807.12

Constant 2021 USD

Summary

Funding agency [Type]

Export-Import Bank of China (China Eximbank) [State-owned Policy Bank]

Recipient

Tonga

Sector

Emergency response (Code: 720)

Flow type

Loan

Level of public liability

Central government debt

Financial distress

Yes

Infrastructure

Yes

Category

Intent

Development (The next section lists the possible statuses.)

Commercial

Development

Representational

Mixed

Financial Flow Classification

ODA-like (The next section lists the possible statuses.)

Official Development Assistance

Other Official Flows

Vague (Official Finance)

Flows categorized based on OECD-DAC guidelines

Project lifecycle

Status

Completion (The next section lists the possible statuses.)

Pledge

Commitment

Implementation

Completion

Suspended

Cancelled

Milestones

Commitment

2007-11-19

Actual start

2008-11-18

Actual complete

2014-08-12

Geography

Description

After riots and fires in November 2006, the Central Business District (CBD) of the city of Nuku'alofa experienced significant damage. Up to 80% of the CBD was destroyed. In response to these riots on November 19, 2007, China Eximbank and the Government of Tonga signed an RMB 440 million (TOP 118,624,000) government concessional loan (GCL) agreement for the Nuku'alofa Central Business District (CBD) Reconstruction Project. The loan carried the following borrowing terms: an interest rate of 2%, a grace period of 5.8333 years, a maturity of 20.8333 years, a management fee of 1%, and a commitment fee of 0.75%. The borrower was expected to use the loan proceeds to finance a November 19, 2007 commercial contract with China Civil Engineering Construction Corporation (CCECC). The loan fully disbursed between the Government of Tonga’s 2009 fiscal year and 2012 fiscal year. The loan's amount outstanding was TOP 0 as of June 30, 2008, TOP 41,517,264 as of June 30, 2009, TOP 52,661,153 as of June 30, 2010, TOP 92,473,011 as of June 30, 2011, TOP 121,264,000 as of June 30, 2012, TOP 130,460,000 as of June 30, 2013, TOP 149,420,000 as of June 30, 2015, TOP 146,344,000 as of June 30, 2016, TOP 142,032,000 as of June 30, 2017, TOP 153,780,000 as of June 30, 2018, TOP 146,540,952 as of June 30, 2019, TOP 147,714,286 as of June 30, 2020, and TOP 144,906,667 as of June 30, 2021. The borrower made a TOP 1,424,115 repayment (TOP 1,424,115 in interest and TOP 0 in principal) between July 1, 2009 and June 30, 2010, a TOP 1,840,052 repayment (TOP 1,840,052 in interest and TOP 0 in principal) between July 1, 2010 and June 30, 2011, a TOP 2,169,710 repayment (TOP 2,169,710 in interest and TOP 0 in principal) between July 1, 2011 and June 30, 2012, a TOP 2,449,615 repayment (TOP 2,449,615 in interest and TOP 0 in principal) between July 1, 2012 and June 30, 2013, an unknown repayment between July 1, 2013 and June 30, 2014, an unknown repayment between July 1, 2014 and June 30, 2015, a TOP 3,115,996 repayment (TOP 3,115,996 in interest and TOP 0 in principal) between July 1, 2015 and June 30, 2016, a TOP 3,180,813 repayment (TOP 3,180,813 in interest and TOP 0 in principal) between July 1, 2016 and June 30, 2017, a TOP 3,037,675.75 repayment (TOP 3,037,675.75 in interest and TOP 0 in principal) between July 1, 2017 and June 30, 2018, a TOP 9,883,177.96 repayment (TOP 2,909,743.58 in interest and TOP 6,973,434.38 in principal) between July 1, 2018 and June 30, 2019, a TOP 2,820,633 repayment (TOP 2,820,633 in interest and TOP 0 in principal between July 1, 2019 and June 30, 2020, and no repayment of principal or interest between July 1, 2020 and June 30, 2021. Approximately 60 percent of the proceeds of the loan were earmarked for direct government capital spending while the remaining 40 percent was earmarked for on-lending to the private sector for office, residential, and retail construction activities in the CBD. The Government of Tonga on-lent to private sector entities at an interest rate of 5%. The purpose of the project was to reconstruct the Central Business District (CBD) of the city of Nuku'alofa. It involved the (a) rehabilitation of the storm water drainage; (b) resurfacing of streets; (c) renovation of sidewalks; (d) landscaping work of the central city park with streetlights; (e) installation of new power supply, including some underground power supply; (f) construction of a soakway for effluent water from septic tanks; (g) extension of the Royal Palace; (h) construction of a new wharf (‘Vuna Wharf’) to attract cruise ships; and (i) reconstruction of office, residential, and retail space (including the Tungi Colonnade, Taumoepeau Building, O.G. Sanft Building, Molisi Tonga Building, and Royco Building). CCECC was the general contractor responsible for implementation, alongside China Railway Construction Corporation (CRCC). Construction began on November 18, 2008. Phase 1 of the project (including the reconstruction of the Tungi Colonnade, Taumoepeau Building, O.G. Sanft Building, Molisi Tonga Building, the Royco Building, and the Royal Palace) was officially completed on November 19, 2010. Phase 2 (which included the establishment of a “Central Park" at the corner of Taufa’ahau road and Wellington road, improvements to sidewalks, roads and drainage systems, the reconstruction of Tungi Arcade, and the construction of Vuna Wharf) commenced on January 10, 2011. All Phase 2 activities, excluding the construction of Vuna Wharf, were completed on or around August 14, 2012. The construction of Vuna Wharf was officially completed and handed over to the local authorities on August 12, 2014. However, this project was controversial in that it contributed to debt sustainability problems for the Government of Tonga. According to a Joint IMF/World Bank Debt Sustainability Analysis that was published in 2011, the combined face value of the RMB-denominated China Eximbank loan for the Nuku'alofa Central Business District (CBD) Reconstruction Project (captured via Project ID#37646) and the RMB-denominated China Eximbank loan for Phase 3 of the National Road Improvement Project (captured via Project ID#39199) was equivalent to 30% of Tonga’s GDP. Then, In May 2012, the IMF published a report which concluded that “Tonga remains at a high risk of debt distress based on the joint IMF-WB low-income country debt sustainability assessment (LIC DSA). Scheduled repayments on the two loans … from the China EXIM Bank may pose a fiscal challenge unless sufficient cash reserves are built up by improving tax collections and reining in current expenses. [The Government of Tonga’s] balance sheet also faces a currency risk as about 61 percent of the outstanding external debt is denominated in Chinese renminbi.” Due to concerns about Tonga’s public debt levels, the repayment terms of the China Eximbank loan for the Nuku'alofa Central Business District (CBD) Reconstruction Project (via grace period extensions) were rescheduled two times: once in 2013 and again in 2018 (as recorded in Project ID#64926 and Project ID#73428). A September 2013 debt rescheduling agreement between China Eximbank and the Government of Tonga amended the original borrowing terms by extending the grace period from 5 years to 10 years. All other borrowing terms (maturity, interest rate, and fees) were left untouched. The loan was thus rescheduled for semi-annual repayment between September 21, 2018 and September 21, 2028. Then, in November 2018, China Eximbank and the Government of Tonga signed a second debt rescheduling agreement, which amended the original borrowing terms by extending the grace period from 5 years to 15 years. All other borrowing terms (maturity, interest rate, and fees) were left untouched. The loan was thus rescheduled for semi-annual repayment between September 21, 2023 and September 21, 2028. As a result of these reschedulings, the borrower agreed to repay the lion’s share of the loan’s principal (in semi-annual installments) over a 5-year period (September 21, 2023 and September 21, 2028) rather that a 15-year period (September 21, 2013 and September 21, 2028).

Additional details

1. The Chinese project title is 的汤加努库阿洛法中央商务区(CBD)重建项目 or 汤加首都商务中心区重建项目. 2. The main sub-borrowers (private sector entities to which the Government of Tonga on-lent) during Phase 1 were are Janfull IDH Ltd, Tungi Colonnade Ltd, OG Sanft Ltd., MF Taumoepeau Ltd., City Assets Ltd. The main sub-borrower during Phase 2 were Tungi Colonnade Ltd and City Assets Ltd. The Government of Tonga expected to start receiving repayments from these private borrowers after the completion of their office, residential, and retail construction projects. As of March 2012, only one private borrower had started repaying the government. At the end of the Government of Tonga’s 2012 fiscal year, Royco owed TOP 2.2 million, Tungi Collonade owed TOP 16.6 million, Taumoepeau owed TOP 7.2 million, and O.G. Sanft owed TOP 10.2 million. 3. 38% of the China Eximbank loan was reportedly used for the construction of Vuna Wharf (TOP $33.9 million), a project overseen by the Ports Authority of Tonga. However, the Authority disputes that it ever directly received money from China Eximbank, and instead received loans from the Government of Tonga at an unknown interest rate. 4. The China Eximbank loan that supported this project is not included in the Overseas Development Finance Dataset that Boston University’s Global Development Policy Center published in December 2020. 5. The borrowing terms of the loan are drawn from the World Bank's Debtor Reporting System (DRS). See https://www.dropbox.com/s/2sw4f7gluxa52fk/DRS%20Official%20Commitments%20from%20China%20Through%202021.xlsx?dl=0 and https://www.dropbox.com/s/ab8qt4n6jijcbhd/IDS_Average%20interest%20on%20new%20external%20debt%20commitments.xlsx?dl=0 and https://www.dropbox.com/s/949n5rctiue6d7c/IDS_Average_grace_period_and_maturity_on_new_external_debt_commitments.xlsx?dl=0

Number of official sources

32

Number of total sources

53

Download the dataset

Details

Cofinanced

No

Direct receiving agencies [Type]

Government of the Kingdom of Tonga [Government Agency]

Indirect receiving agencies [Type]

Tungi Colonnade Ltd [Private Sector]

O.G Sanft Ltd [Private Sector]

MF Taumoepeau Ltd [Private Sector]

City Assets Ltd [Private Sector]

Port Authority of Tonga [Government Agency]

Janfull International Dateline Hotel Ltd. [Miscellaneous Agency Type]

Implementing agencies [Type]

China Civil Engineering Construction Corporation (CCECC) [State-owned Company]

China Railway Construction Corporation (CRCC) [State-owned Company]

Loan Details

Maturity

21 years

Interest rate

2.0%

Grace period

6 years

Grant element (OECD Grant-Equiv)

40.8214%

Bilateral loan

Government Concessional Loan

Investment project loan