Narrative
Full Description
Project narrative
The China Nuclear Industry 22nd Construction Company Limited [核工业第22建设有限公司] donated a 5,000-kilowatt generator set and was installed on 20th December 2009. The gift was targeted at relieving the power shortage in Dili.