Bank of China (Jakarta Branch) contributes $191 million to $454.9 million syndicated loan for 945MW Banten Lontar Power Plant Construction Project

Commitments (Constant USD, 2023)$264,977,694
Commitment Year2009Country of ActivityIndonesiaDirect Recipient Country of IncorporationIndonesiaOverseas JurisdictionIndonesiaSectorEnergyFlow TypeLoan

Status

Project lifecycle

Completion

Pipeline: PledgePipeline: CommitmentImplementationCompletion

Timeline

Key dates

Commitment date
May 4, 2009
Start (actual)
Jan 6, 2009
End (actual)
Feb 13, 2012
First repayment
May 3, 2012
Last repayment
May 1, 2022

Geospatial footprint

Map overview

Visualizes the AidData-provided feature geometry for this project.

Loading map…

The purpose of the project was to install a 945-megawatt (MW) coal-fired power plant — with three 315MW generators (Unit 1, Unit 2, and Unit 3) — in Lontar Village in Banten Province (locational coordinates: -6.0588745, 106.4643002). More detailed locational information can be found at https://www.openstreetmap.org/way/399038178#map=16/-6.0589/106.4646

Stakeholders

Organizations involved in projects and activities supported by financial and in-kind transfers from Chinese government and state-owned entities

Ultimate beneficial owners

At least 25% host country ownership

Funding agencies

State-owned Commercial Banks

  • Bank of China (BOC)

Cofinancing agencies

Private Sector

  • BNP Paribas S.A.
  • Société Générale S.A. (SocGen or Societe Generale)

Receiving agencies

State-owned companies

  • PT Perusahaan Listrik Negara (Persero) (PLN)

Implementing agencies

Private Sector

  • Dalle Energy

State-owned companies

  • Dongfang Electric Corporation (DEC)

Insurance providers

State-owned companies

  • China Export & Credit Insurance Corporation (Sinosure)

Loan desecription

Bank of China (Sichuan and Jakarta) branch contributions to $454.9 million syndicated loan for 945MW Banten Lontar Power Plant Construction Project

Grace period3 yearsGrant element31.1208%Interest rate (t₀)3.84938%Interest typeVariable Interest RateLoan tenor6-month rateMaturity13 years

Narrative

Full Description

Project narrative

On May 4, 2009, Bank of China and Perusahaan Listrik Negara (PLN) — an Indonesian government-owned corporation that has a monopoly on electricity distribution in Indonesia and generates the majority of the country's electrical power — signed a $454,974,082 loan agreement for the 945MW Banten Lontar Power Plant Construction Project. Bank of China's Jakarta Branch and Sichuan Branch each contributed $191 million to the syndicate, while BNP Paribas and Société Générale each contributed $36.4 million. The loan carried the following borrowing terms: a 13-year maturity, a 3-year grace period, and an interest rate of 6-month LIBOR (1.356% in May 2009) plus a a 2.3% margin. It was backed by a Sinosure credit insurance policy. The proceeds of the loan were to be used by the borrower to partially finance the $820 million cost of an EPC contract between PLN and a consortium consisting of Dongfang Electric Corporation and Dalle Energy (an Indonesian firm), which was signed on August 7, 2007. The purpose of the project was to install a 945-megawatt (MW) coal-fired power plant — with three 315MW generators (Unit 1, Unit 2, and Unit 3) — in Lontar Village in Banten Province (locational coordinates: -6.0588745, 106.4643002). The electricity generated by the power plant is transmitted through the PLTU substation, the Teluk Naga substation, and then Tangerang Baru substation. Construction took place between January 6, 2009 and February 13, 2012. Unit 1 was officially inaugurated and put into commercial use on December 28, 2011. Unit 2 was put into commercial use on February 29, 2012. Unit 3 was put into commercial use on April 10, 2012. The project was officially completed and handed over to the local authorities on December 28, 2012.

Staff comments

1. This project is also known as the PLTU 3 Banten-Teluk Naga 3x315MW Power Plant Project, the 945MW Banten Lontar Power Station Project, the PLTU 3 Teluk Naga/Lontar Project, the PLTU 3 Banten Project, the Banten-Lontar Power Plant Project, and the 3x315 MW PLTU 3 Banten — Lontar Project. The Chinese project title is 印尼龙湾3×315MW燃煤机组电厂 or 印尼龙湾燃煤电站. 2. This project was part of the Government of Indonesia’s ‘fast-track program’.