Project ID: 39375

China Eximbank provides $117 million preferential buyer’s credit for 110MW Jatigede Hydropower Plant Construction Project (Linked to Project ID#38861)

Commitment amount

$ 131980276.6062107

Adjusted commitment amount

$ 131980276.61

Constant 2021 USD

Summary

Funding agency [Type]

Export-Import Bank of China (China Eximbank) [State-owned Policy Bank]

Recipient

Indonesia

Sector

Energy (Code: 230)

Flow type

Loan

Level of public liability

Central government debt

Infrastructure

Yes

Category

Intent

Mixed (The next section lists the possible statuses.)

Commercial

Development

Representational

Mixed

Financial Flow Classification

OOF-like (The next section lists the possible statuses.)

Official Development Assistance

Other Official Flows

Vague (Official Finance)

Flows categorized based on OECD-DAC guidelines

Project lifecycle

Status

Implementation (The next section lists the possible statuses.)

Pledge

Commitment

Implementation

Completion

Suspended

Cancelled

Milestones

Commitment

2013-09-03

Actual start

2015-10-02

Geography

Description

On September 3, 2013, China Eximbank and the Government of Indonesia signed a $117,000,000 preferential buyer's credit (PBC) agreement [China Eximbank PBC No. (31) Total No. (275)] for the Jatigede Hydropower Plant Construction Project. The PBC carried the following borrowing terms: a maturity of 11y 10m 18d, a grace period of 2y 4m 18d, an interest rate of 3.00%, and a 0.2% management fee, and a commitment fee of 0.2%. The loan went into effect on September 3, 2014 and its closing date was September 9, 2016. The first principal payment was scheduled for January 21, 2016 and the last principal payment was scheduled for July 21, 2025. The condition precedent for the first disbursement was fulfilled, and first loan withdrawal was on December 24, 2013. The proceeds of the PBC were to be used by the borrower to partially finance a $135 million commercial (EPC) contract between Perusahaan Listrik Negara (PLN) — an Indonesian state-owned electricity company — and Sinohydro Corporation Limited. The purpose of the project was to construct a 110MW hydroelectric power plant on the Cimanuk River in Sumedang Regency, West Java. It is located 19 km (12 mi) east of the town of Sumedang (exact locational coordinates: 6°51′23″S 108°05′41″E). Sinohydro Corporation Limited and a consortium of Indonesian contractors were responsible for project implementation. Donfang Electric Corporation (DEC) was the supplier of two 55 MW water turbine-generator sets. Construction commenced on October 2, 2015. The plant's construction reached a 73% completion rate in October 2019 after developers finished excavating a 2,200 meter tunnel to channel water from the reservoir to the dam's turbines. Then, in December 2019, PLN announced that the 110MW hydropower plant was expected to start operations in 2020. China Eximbank also provided a separate loan for Jatigede Dam Construction Project (captured in Project ID#38861). In 2021, the project was completed and began operating.

Additional details

1. This project is also known as Jatigede Dam Phase 2. The Chinese project title is 印度尼西亚佳蒂格德水电站. 2. The China Eximbank loan that supported this project is not included in the Overseas Development Finance Dataset that Boston University’s Global Development Policy Center published in December 2020. 3. This project is linked to Project ID#38861.

Number of official sources

7

Number of total sources

8

Download the dataset

Details

Cofinanced

No

Direct receiving agencies [Type]

Government of Indonesia [Government Agency]

Implementing agencies [Type]

SinoHydro [State-owned Company]

Indonesia Ministry of Public Works and Housing [Government Agency]

Perusahaan Listrik Negara (PLN) [State-owned Company]

Dongfang Electric Corporation (DEC) [State-owned Company]

Loan Details

Maturity

12 years

Interest rate

3.0%

Grace period

2 years

Grant element (OECD Grant-Equiv)

20.7278%

Bilateral loan

Export buyer's credit

Investment project loan

Preferential Buyer's Credit