China Eximbank provides $117 million preferential buyer’s credit for 110MW Jatigede Hydropower Plant Construction Project (Linked to Project ID#38861)
Commitment amount
$ 131980276.6062107
Adjusted commitment amount
$ 131980276.61
Constant 2021 USD
Summary
Funding agency [Type]
Export-Import Bank of China (China Eximbank) [State-owned Policy Bank]
Recipient
Indonesia
Sector
Energy (Code: 230)
Flow type
Loan
Level of public liability
Central government debt
Infrastructure
Yes
Category
Project lifecycle
Geography
Description
On September 3, 2013, China Eximbank and the Government of Indonesia signed a $117,000,000 preferential buyer's credit (PBC) agreement [China Eximbank PBC No. (31) Total No. (275)] for the Jatigede Hydropower Plant Construction Project. The PBC carried the following borrowing terms: a maturity of 11y 10m 18d, a grace period of 2y 4m 18d, an interest rate of 3.00%, and a 0.2% management fee, and a commitment fee of 0.2%. The loan went into effect on September 3, 2014 and its closing date was September 9, 2016. The first principal payment was scheduled for January 21, 2016 and the last principal payment was scheduled for July 21, 2025. The condition precedent for the first disbursement was fulfilled, and first loan withdrawal was on December 24, 2013. The proceeds of the PBC were to be used by the borrower to partially finance a $135 million commercial (EPC) contract between Perusahaan Listrik Negara (PLN) — an Indonesian state-owned electricity company — and Sinohydro Corporation Limited. The purpose of the project was to construct a 110MW hydroelectric power plant on the Cimanuk River in Sumedang Regency, West Java. It is located 19 km (12 mi) east of the town of Sumedang (exact locational coordinates: 6°51′23″S 108°05′41″E). Sinohydro Corporation Limited and a consortium of Indonesian contractors were responsible for project implementation. Donfang Electric Corporation (DEC) was the supplier of two 55 MW water turbine-generator sets. Construction commenced on October 2, 2015. The plant's construction reached a 73% completion rate in October 2019 after developers finished excavating a 2,200 meter tunnel to channel water from the reservoir to the dam's turbines. Then, in December 2019, PLN announced that the 110MW hydropower plant was expected to start operations in 2020. China Eximbank also provided a separate loan for Jatigede Dam Construction Project (captured in Project ID#38861). In 2021, the project was completed and began operating.
Additional details
1. This project is also known as Jatigede Dam Phase 2. The Chinese project title is 印度尼西亚佳蒂格德水电站. 2. The China Eximbank loan that supported this project is not included in the Overseas Development Finance Dataset that Boston University’s Global Development Policy Center published in December 2020. 3. This project is linked to Project ID#38861.
Number of official sources
7
Number of total sources
8
Details
Cofinanced
No
Direct receiving agencies [Type]
Government of Indonesia [Government Agency]
Implementing agencies [Type]
SinoHydro [State-owned Company]
Indonesia Ministry of Public Works and Housing [Government Agency]
Perusahaan Listrik Negara (PLN) [State-owned Company]
Dongfang Electric Corporation (DEC) [State-owned Company]
Loan Details
Maturity
12 years
Interest rate
3.0%
Grace period
2 years
Grant element (OECD Grant-Equiv)
20.7278%