Narrative
Full Description
Project narrative
On June 5, 2012, the Export-Import Bank of China (China Eximbank) and the Ministry of Finance of the Republic of Tajikistan signed a $50,540,000 preferential buyer's credit (PBC) agreement [CHINA EXIMBANK PBC NO. 2012 (5) TOTAL NO. (193)] for the Third Stage (Chormagzak Tunnel) of Phase 1 of the Dushanbe-Dangara Road Reconstruction Project. The China Eximbank PBC (loan) agreement was unanimously ratified by the Tajik Parliament in October 2012. The loan carried a maturity of 19.6 years, a grace period of 8.6 years, an interest rate of 2%, a 0.2% commitment fee, and a 0.2% management fee ($101,080). The borrower was expected to use the loan proceeds to finance 95% of the cost of a $$53,200,000 commercial contract between Tajikistan's Ministry of Transport and China Road and Bridge Corporation (CRBC), which was signed on December 7, 2011. The remaining 5% of the commercial contract cost was to be covered by the Government of Tajikistan. The project supported the construction of the 4.43 km Chormagzak Tunnel along the 147.64 km Dushanbe-Dangara section of the Dushanbe-Kulma highway (which is also known as the Tajikistan-China highway). China Road and Bridge Corporation (CRBC) was the contractor responsible for project implementation. Construction began on October 15, 2010, and the project was completed on October 1, 2013.
Staff comments
1. The Chormagzak Tunnel is now known as the Khatlon Tunnel. 2. This project is linked to the China Eximbank-financed First Stage and China Eximbank-financed Second Stage of Phase 1 of the Dushanbe-Dangara Road Reconstruction Project (see Record ID#40063, #53750). China Eximbank reportedly provided $243.4 million of debt financing in total for all three stages of Phase 1. 3. The Russian project title for Stage 3 of Phase 1 is Реабилитация третьего этапа фазы I автомобильной дороги «Душанбе-Кульма». The Chinese project title is 塔中公路一期(杜尚别—丹卡拉段)道路修复改造项目. 4. The China Eximbank PBC (loan) agreement can be accessed in its entirety via http://portali-huquqi.tj/publicadliya/view_qonunhoview.php?showdetail=&asosi_id=13962 and https://www.dropbox.com/scl/fi/bny36nlsb4miqbucamdyy/Tajikistan-2012-China-Eximbank-PBC-for-Third-Stage-Chormagzak-Tunnel-of-Phase-1-of-the-Dushanbe-Dangara-Road-Reconstruction-Project-Russian.pdf?rlkey=7od8u7se8nuutcdkica52wpt1&dl=0 and https://www.dropbox.com/scl/fi/bdtxzjfykl4fsi5we8kq5/Tajikistan-2012-China-Eximbank-PBC-for-Third-Stage-Chormagzak-Tunnel-of-Phase-1-of-the-Dushanbe-Dangara-Road-Reconstruction-Project-English.pdf?rlkey=d2vwr0o2l08udzs3e6pevs6gq&dl=0 5. The loan's maturity (19.6 years) and grace period (8.6 years) are drawn from the World Bank's International Debt Statistics. See https://www.dropbox.com/scl/fi/xcffgcc5mm4hg49i9u7di/February-2025-IDS-Extraction-Tajikistan-s-Official-Sector-PRC-Borrowings-and-Borrowing-Terms.xlsx?rlkey=cq2kfom6b7ajq6njzram1q1sa&dl=0