Project ID: 40971

Chinese Government provides a RMB 20 million grant — via a September 2015 ETCA — for the Lebanese National Higher Conservatory of Music Construction Project (Linked to Project ID#65712, #65714, #65786, and #65797)

Commitment amount

$ 3571078.8281448144

Adjusted commitment amount

$ 3571078.83

Constant 2021 USD

Summary

Funding agency [Type]

China Ministry of Commerce [Government Agency]

Recipient

Lebanon

Sector

Other social infrastructure and services (Code: 160)

Flow type

Grant

Infrastructure

Yes

Category

Intent

Development (The next section lists the possible statuses.)

Commercial

Development

Representational

Mixed

Financial Flow Classification

ODA-like (The next section lists the possible statuses.)

Official Development Assistance

Other Official Flows

Vague (Official Finance)

Flows categorized based on OECD-DAC guidelines

Project lifecycle

Status

Implementation (The next section lists the possible statuses.)

Pledge

Commitment

Implementation

Completion

Suspended

Cancelled

Milestones

Commitment

2015-01-01

Actual start

2019-12-20

Planned complete

2022-12-01

Geography

Description

On September 10, 2015, the Chinese Government and the Lebanese Council for Development and Reconstruction (CDR) signed an Economic and Technical Cooperation Agreement (ETCA), in which the Chinese Government committed RMB 20 million in grant funding for unspecified purposes. The ETCA stipulated that the grant would be allocated at a later date following an agreement between the two governments and that it would be disbursed through a bank account established between China Development Bank (CDB) and the Banque du Liban (Lebanon’s central bank). Then, on December 14, 2017, the Council of Ministers of Lebanon allocated the RMB 20 million committed in this ETCA to the Lebanese National Higher Conservatory of Music Construction Project. It also allocated a RMB 50 million grant committed in an ETCA signed on February 26, 2013 (captured by linked project ID#65712) and a RMB 50 million grant committed in an ETCA signed on December 5, 2013 (captured by linked project ID#65714) to the project, for a total contribution of RMB 120 million (pg.136 of "CDR Progress Report 2017"). Previously, on May 10, 2017, the Chinese Government and the Government of Lebanon signed an ETCA, in which the Chinese Government committed a RMB 100 million grant (captured by linked project ID#65786) for the Lebanese National Higher Conservatory of Music Construction Project. After the allocation of the RMB 120 million from the three ETCAs, on January 9, 2018, the Chinese Government and the Government of Lebanon signed an exchange of letters regarding the project in the presence of Prime Minister of Lebanon Saad Hariri. Then, on April 11, 2019, the Chinese Government and the Government of Lebanon signed an ETCA, in which the Chinese Government committed a RMB 300 million ($44 million USD) grant to Lebanon for the Lebanese National Higher Conservatory of Music Construction Project and other projects that would be mutually agreed upon by the two governments. Then, on December 16, 2019, the Chinese Government and the Government of Lebanon signed an agreement allocating RMB 213 million of the RMB 300 million grant proceeds to the Lebanese National Higher Conservatory of Music Construction Project. The remaining RMB 87 million of the grant proceeds continued to be unallocated. The RMB 213 million allocated towards the Lebanese National Higher Conservatory of Music Construction Project is captured by linked project ID#65797. The purpose of the project was to construct a building for the Lebanese National Higher Conservatory of Music (Le Conservatoire libanais national supérieur de musique) in the town of Dbaye (الضبية). The conservatory was designed to cover a land area of 14,386 square meters and have a total floor area of 26,588 square meters. The building was to include a 1,200-seat concert hall, a teaching building (including a 350-seat concert hall), a generator room, other equipment rooms, an underground garage, a reception hall, a security room, and fences. The conservatory, once completed, was expected to will attract musicians from neighboring areas, improve the quality and capacity of musical education in Lebanon, and provide a first-class professional venue for the public to enjoy musical performances. The construction of the conservatory was the first complete project aided by the Chinese Government to the Lebanese Government. China IPPR International Engineering Co., Ltd. (中国中元国际工程有限公司) was the contractor responsible for project design and management, while China State Construction Engineering Corporation (CSCEC) was the general contractor responsible for implementation. Lebanon's Ministry of Culture was also involved in implementation. The Chinese Government provided the design plans for the conservatory to Lebanon's Ministry of Culture on September 19, 2018. The Chinese Government and the Lebanese Government signed the project implementation agreement on October 30, 2018. Then, in April 1, 2019, the project design team from China IPPR International Engineering Co., Ltd. briefed Prime Minister Hariri on the progress and preliminary design of the project. The project's formal groundbreaking ceremony was held on December 20, 2019. At the time, the conservatory was expected to be completed within 3 years. However, the implementation of this project was delayed because of the outbreak of the COVID-19 pandemic. A second formal groundbreaking ceremony was held on December 18, 2020.

Additional details

Another ETCA for the provision of a RMB 50 million interest-free loan was signed on the same date, as captured by project ID#40970. This project is also known as the Lebanese National Higher Institution of Music Construction Project. The Chinese project title is 援黎巴嫩国家高等音乐学院项目 or 黎巴嫩国家高等音乐学院项目. The French project title is La construction du conservatoire nommé Institut national supérieur de musique. This project is known as "Economic and Technical Cooperation - 2015 Construction and Equipment of the Lebanese National Higher Conservatory of Music" in the Lebanese Council for Development and Reconstruction's (CDR) database. The agreement number is 12965 (see "CDR Funding - Economic and Technical Cooperation - 2015 Construction and Equipment of the Lebanese National Higher Conservatory of Music). As this is an ETCA, which is a financing mechanism specific to China's Ministry of Commerce (MOFCOM), AidData has coded MOFCOM as the specific Chinese Government institution responsible for providing this grant. A progress report ("CDR Progress Report 2017") from the Lebanese Council for Development and Reconstruction (CDR) says that May 13, 2017 was the signing date of the RMB 10 million ETCA, but other official sources ("Agreement on economic and technical cooperation between China and Lebanon", a press release dated May 10, 2017) identified the signing date as May 10, 2017.

Number of official sources

29

Number of total sources

36

Download the dataset

Details

Cofinanced

No

Direct receiving agencies [Type]

Lebanese Council for Development and Reconstruction (CDR) [Government Agency]

Implementing agencies [Type]

China State Construction Engineering Corporation (CSCEC) [State-owned Company]

Lebanese Ministry of Culture [Government Agency]

China IPPR International Engineering Co., Ltd. [State-owned Company]