China Eximbank provides $78 million preferential buyer's credit for Section 1B of Manado-Bitung Toll Road Project (Linked to Record ID#61426)

Commitments (Constant USD, 2023)$85,185,314
Commitment Year2016Country of ActivityIndonesiaDirect Recipient Country of IncorporationIndonesiaSectorTransport And StorageFlow TypeLoan

Status

Project lifecycle

Completion

Pipeline: PledgePipeline: CommitmentImplementationCompletion

Timeline

Key dates

Commitment date
Jun 13, 2016
Start (actual)
Oct 12, 2014
End (actual)
Dec 25, 2019
First repayment (originally scheduled)
Dec 30, 2020
Last repayment (originally scheduled)
Dec 28, 2030

Geospatial footprint

Map overview

Visualizes the AidData-provided feature geometry for this project.

Loading map…

The purpose of the project was to construct a 7 km segment (Section 1B) of the Manado-Bitung Toll Road from Sukur to Air Madidi. More detailed locational information can be found at https://www.openstreetmap.org/way/587078149#map=14/1.4105/125.0115 and https://www.openstreetmap.org/way/700635160

Stakeholders

Organizations involved in projects and activities supported by financial and in-kind transfers from Chinese government and state-owned entities

Ultimate beneficial owners

At least 25% host country ownership

Funding agencies

State-owned Policy Banks

  • Export-Import Bank of China (China Eximbank)

Receiving agencies

Government Agencies

  • Government of Indonesia

Implementing agencies

State-owned companies

  • CSCEC Road and Bridge Group

Loan desecription

China Eximbank contribution to $78,099,963 preferential buyer's credit loan for Section 1B of Manado-Bitung Toll Road Project

Grace period5 yearsGrant element41.4363%Interest rate (t₀)3%Interest typeFixed Interest RateMaturity15 years

Narrative

Full Description

Project narrative

In 2014, China Eximbank agreed in principle to provides a loan worth 1.1 trillion IDR for the construction of the Manado-Bitung Toll Road. Then, on June 13, 2016, China Eximbank and the Government of Indonesia signed a $78,099,963 preferential buyer's credit (PBC) agreement [China Eximbank PBC No (2016) 7 Total No (395)] for Section 1B of the Manado-Bitung Toll Road Project. The PBC carries the following borrowing terms: a 3% interest rate, a 15-year grace maturity, a 5 year grace period, a 0.2% management fee, and a 0.2% commitment fee. The proceeds of the PBC were to be used by the borrower to partially finance a $90 million commercial (EPC) contract with China State Construction Engineering Corporation (CSCEC), which was signed on October 13, 2015. As of September 2018, $24,727,417 of the PBC had been disbursed. On October 13, 2017, ICBC Indonesia agreed to contribute IDR 1000 billion to an IDR 7756 trillion syndicated loan agreement with PT Jasamarga Manado Bitung, of which IDR 500 billion was earmarked for Section 2 of Manado-Bitung Toll Road Project (captured in Record ID#61426) and IDR 500 billion was earmarked for the Pandaan-Malang Toll Road Project (captured in Record ID#69113). PT Jasamarga Manado Bitung is a special purpose vehicle and joint venture between PT Jasa Marga (Persero) Tbk (65%), PT WIKA (Persero) Tbk, and PT PP (Persero) (15%). The syndicated loan that was issued to PT Jasamarga Manado Bitung has a maturity of 15 years. Members of the syndicated included BNI, BCA, Bank Mandiri, Sarana Multi Infrastruktur (SMI), ICBC Indonesia, Bank Sulselbar, Bank Riau Kepri and Central Java Bank. The purpose of the Manado-Bitung Toll Road Project was to construct a 39 km toll road that connects two of North Sulawesi’s largest cities (Manado and Bitung) as major access roads to Bitung Special Economic Zone (KEK) and Bitung International Hub Port. Section 1A involved the construction a 7.9 km segment of the toll road from Manado to Sukur Ring Road. Section 1B involved the construction a 7 km segment of the toll road from Sukur to Air Madidi. Section 2A involved the construction an 11.5 km segment of the toll road from Airmadidi to Danowudu. Section 2B involved the construction of a 13.5 km segment of the toll road from Danowudu to Bitung. Section 1 was constructed by the Government of Indonesia. Section 2 was constructed by the private sector (PT Jasamarga Manado Bitung). CSCEC Road and Bridge Group, a subsidiary of China State Construction Engineering Corporation (CSCEC), was the contractor responsible for the implementation of Section 1B. An official project commencement ceremony took place on January 16, 2013. However, the construction of Section 1 did not begin until October 12, 2014 and the project subsequently encountered major delays due to land acquisition challenges. As of May 2017, the project had only achieved a 20% completion rate. Sections 1 and 2 of the project were ultimately completed on December 25, 2019.

Staff comments

1. The Chinese project title is 万鸦老--比通高速公路项目. The Indonesia project title is Jalan Tol Manado-Bitung or Proyek pembangunan jalan tol Manado-Bitung. 2. The Manado-Bitung Toll Road Project is divided into two sections, with two subsections each. Section 1 is 13.5 kilometers long and it was to be constructed by the Government of Indonesia; Section 2 is 25.5 kilometers long and it was to be constructed by the private sector. Section 1A (Manado-Sukur Ring Road) is 7.9 km long, Section 1B (Sukur-Air Madidi) is 7 km long, Section 2A (Airmadidi-Danowudu) is 11.5 km long, and Section 2B (Danowudu-Bitung) is 13.5 km long. 3. In the Overseas Development Finance Dataset that Boston University’s Global Development Policy Center published in December 2020, it identifies the face value of the China Eximbank loan that supported this project as $503 million. However, this estimate appears to be based on the overall cost of the Manado-Bitung Toll Road Project. AidData relies upon the precise face value ($78,099,963) of the loan [China Eximbank PBC No (2016) 7 Total No (395)] that is recorded by the borrower (the Government of Indonesia).