China Eximbank provides $690.7 million preferential buyer’s credit loan for 113km Thiès-Touba Toll Road Project
Commitment amount
$ 775188224.6636462
Adjusted commitment amount
$ 775188224.66
Constant 2021 USD
Summary
Funding agency [Type]
Export-Import Bank of China (China Eximbank) [State-owned Policy Bank]
Recipient
Senegal
Sector
Transport and storage (Code: 210)
Flow type
Loan
Level of public liability
Central government debt
Infrastructure
Yes
Category
Project lifecycle
Geography
Description
On June 8, 2015, China Eximbank and the Government of Senegal signed a preferential buyer’s credit (PBC) agreement worth USD 690,728,949 for the Thiès-Touba Toll Road Project. The PBC reportedly carries the following terms: a 25-year maturity, a 5-year grace period, and a 2% interest rate. The purpose of this loan was to cover 85% of the total project cost equal to $812 million. This project involved the construction of a 112.933 km, four-lane, toll road between the city of Touba and the city of Thiès and the installation of tolling and video surveillance equipment. The purpose of the project was to connect two of the country’s primary growth areas by linking Touba, Senegal’s second-largest city, with the existing highway network in Thiès, on the perimeter of Dakar, the country’s dominant urban area. The road was designed to conform with French codes and standards. CCCC First Highway Consultants Co. Ltd. was responsible for the design of the project. China Road and Bridge Corporation (CRBC), a subsidiary of China Communications Construction Company, was the general contractor responsible for project implementation. CCCC First Navigation Engineering Bureau Co., Ltd. also served as subcontractor. The project commenced on January 16, 2016 and it was originally anticipated that the project would reach completion within 45 months (with a defect liability period of 12 months). However, the road was ultimately completed opened for traffic on December 20, 2018. Then, on February 1, 2019, the road officially began toll operations.
Additional details
1. This project is also known as the Ilaa Touba Highway Project, the Thiès-Touba Toll Highway Project, and the Thiès-Touba Toll Expressway Project. The Chinese project title is 建的捷斯—图巴高速公路项目. The French project title is Le projet de construction de l'autoroute Thiès-Touba.
Number of official sources
29
Number of total sources
35
Details
Cofinanced
No
Direct receiving agencies [Type]
Government of Senegal [Government Agency]
Implementing agencies [Type]
China Road & Bridge Corporation (CRBC) [State-owned Company]
CCCC Highway Consultants Co., Ltd. (中交公路规划设计院有限公司) [State-owned Company]
CCCC First Navigation Engineering Bureau Co., Ltd. [State-owned Company]
Loan Details
Maturity
25 years
Interest rate
2.0%
Grace period
5 years
Grant element (OECD Grant-Equiv)
53.2028%