Narrative
Full Description
Project narrative
On October 3, 2016, China Development Bank and the Electricity Supply Commission (Eskom) — South Africa's state-owned electric power company — signed a $500 million loan agreement. The South African government-guaranteed loan was payable three years after the date the loan agreement was signed. Its interest rate is unknown. The proceeds of the loan were intended to support Eskom’s capital expansion program, including the Medupi, Kusile, and Ingula power plants and the Matla mine 1 shaft relocation. The loan fully disbursed in December 2016. Medupi is a coal-fired power plant with a capacity of 4764MW, Kusile is a coal-fired power plant with a capacity of 4800MW, and Ingula is a pumped-storage hydroelectric power plant with a capacity of 1332MW. As of 2018, the Ingula Plant was fully operational, but the Medupi and Kusile Plants were still under construction.
Staff comments
1. In 2017, CDB provided an additional $1.5 billion loan to Eskom for the Medupi Power Plant, which is captured via Record ID#58385.