China Eximbank provides $98.6 million loan for 46MW Hirgigo Power Plant Expansion Project (Linked to Record ID#30950)

Commitments (Constant USD, 2023)$101,119,544
Commitment Year2014Country of ActivityEritreaDirect Recipient Country of IncorporationEritreaSectorEnergyFlow TypeLoan

Status

Project lifecycle

Completion

Pipeline: PledgePipeline: CommitmentImplementationCompletion

Timeline

Key dates

Commitment date
Jan 1, 2014
Start (actual)
May 1, 2015
End (planned)
Jan 1, 2014
End (actual)
Nov 15, 2017

Geospatial footprint

Map overview

Visualizes the AidData-provided feature geometry for this project.

Loading map…

Hirgigo Power Plant (محطة توليد الكهرباء) is located near the port city of Massawa. More detailed locational information can be found at http://globalenergyobservatory.org/geoid/42621 and https://www.openstreetmap.org/way/421955715.

Stakeholders

Organizations involved in projects and activities supported by financial and in-kind transfers from Chinese government and state-owned entities

Ultimate beneficial owners

At least 25% host country ownership

Funding agencies

State-owned Policy Banks

  • Export-Import Bank of China (China Eximbank)

Receiving agencies

Government Agencies

  • Government of Eritrea

Implementing agencies

State-owned companies

  • China Shanghai (Group) Corporation for Foreign Economic and Technological Cooperation (China SFECO Group)
  • Eritrean Electric Cooperation

Loan desecription

China Eximbank provides $98.6 million loan for 46MW Hirgigo Power Plant Expansion Project

Interest typeUnknown

Narrative

Full Description

Project narrative

In 2014, China Eximbank and the Government of Eritrea signed a $98.6 million concessional loan agreement for 46MW Hirgigo Power Plant Expansion Project. The borrowing terms of the loan are unknown. The proceeds were used to finance a commercial contract with Shanghai Corporation for Foreign Economic & Technical Cooperation (SFECO), which was signed in July 2012. This project involved the installation of two 23MW oil-fired power generation units at the Hirgigo Power Plant (محطة توليد الكهرباء), which is located near the port city of Massawa. The power plant was expected to supply electricity to Koka gold mine and Bluestar Cleaning Company. SFECO was the contractor responsible for project implementation. It was originally envisaged that the project would reach completion by January 2014. However, construction did not commence until in May 2015 or conclude until May 2016. A ceremony was held to turn on the 12K60MC-S low-speed diesel engines and hand over the project to the Eritrean Electric Corporation on May 12, 2016. Then, on November 15, 2017, the inauguration ceremony for the power plant took place. The Hirgigo Power Plant reportedly has the capacity to produce approximately 73% of Eritrea's total power needs. The plant serves electricity users already connected to the grid, most of which are in Asmara or Massawa. More specifically, the plant with benefit the large industrial users in these areas including SFECO—which operates the China Eximbank-financed Koka gold mine (captured via Record ID#30950).

Staff comments

1. This project is also known as the 2X23MW Hirgigo Thermal Power Plant Upgrade Project. The Chinese project title is Hirgigo电厂建设拥有2台23兆瓦发电机组 or 马萨瓦电厂扩容项目 or 新增23兆瓦发电机组2台 or 红海明珠 厄特电站扩建项目 or 厄立特里亚唯一大型电厂扩建项目.