Project ID: 53269

Chinese Government provides RMB 300 million interest-free loan for Ebimpé Olympic Stadium Construction Project (Linked to Project ID#73441, #85370)

Commitment amount

$ 53903782.09740425

Adjusted commitment amount

$ 53903782.1

Constant 2021 USD

Summary

Funding agency [Type]

China Ministry of Commerce [Government Agency]

Recipient

Cote d'Ivoire

Sector

Other social infrastructure and services (Code: 160)

Flow type

Loan

Level of public liability

Central government debt

Infrastructure

Yes

Category

Intent

Development (The next section lists the possible statuses.)

Commercial

Development

Representational

Mixed

Financial Flow Classification

ODA-like (The next section lists the possible statuses.)

Official Development Assistance

Other Official Flows

Vague (Official Finance)

Flows categorized based on OECD-DAC guidelines

Project lifecycle

Status

Completion (The next section lists the possible statuses.)

Pledge

Commitment

Implementation

Completion

Suspended

Cancelled

Milestones

Commitment

2014-11-04

Planned start

2016-01-01

Actual start

2016-12-10

Planned complete

2019-11-21

Actual complete

2020-10-03

NOTE: Red circles denote delays between planned and actual dates

Geography

Description

On November 4, 2014, China’s Ministry of Commerce and the Government of Cote d'Ivoire signed an RMB 300 million (CFA 25,710,000,000) interest-free loan agreement for the Ebimpé Olympic Stadium Construction Project. This loan carries the following borrowing terms: a 25-year maturity, a 15-year grace-period, a 0% interest rate, and a 0% default (penalty) interest rate. It is scheduled for repayment between December 1, 2029 and November 30, 2039. In addition to this loan, this stadium project was financed by an additional grant and interest-free loan from the Chinese Government: (1) a CFA 11.9 billion grant provided in March 2017 (captured via Project ID#85370), and (2) a CFA 20.69 million interest-free loan issued on February 22, 2016 (captured via Project ID#73441). The loan and grant proceeds were to be used to finance an RMB 750,000,000 (CFA 63,990,243,240) commercial contract [ID#2016-0-2-1417/02-29 between Ivorian Government and Beijing Construction Engineering Group (BCEG), which was signed on July 22, 2016. The Ivorian Government was responsible for providing CFA 4 billion of counterpart financing for earthworks and the installation of water, electrical and telecommunications infrastructure at the project site. This project involved the construction of a 60,012 seat stadium in Ebimpé within the Anyama sub-prefecture. It also involved the construction of an Olympic village surrounding the stadium, which has 4 housing estates, a training complex, administrative buildings, a commercial area, a clinic, a 4-star hotel, a 9-hole golf course, and of a medium voltage power line (15 kV) dedicated to the stadium (from the Yopougon 2 HV/MV transformer station to the industrial zone). Additionally, it involved the construction of a 10,000 seat multi-purpose arena. Beijing Construction Engineering Group (BCEG) was the contractor responsible for implementation. It hired approximately 1000 workers, of which 350 were Chinese and 650 were Ivorian. Project implementation commenced on December 10, 2016. Then, a groundbreaking ceremony was held on December 22, 2016 (originally planned for January 2016). Shortly thereafter, on December 31, 2016, the Chinese Government made a loan disbursement worth CFA 14 billion. An electrical connection for the project site was established on August 18, 2017. Foundation pile construction was completed on September 26, 2017. Construction was expected to last 24 months and project was originally expected to reach completion on October 21, 2019. When the Ivorian Minister of Sports inspected the construction site in August 2018, the project had achieved a 50% completion rate and its expected completion (delivery) date had been pushed back to November 21, 2019. An opening ceremony for the stadium took place on October 3, 2020. It was completed in advance of the the 2021 Africa Cup of Nations football (soccer) tournament. According to the Government of Côte d'Ivoire’s Aid Management Platform (AMP), the project encountered several problems during implementation, including ‘bad behavior’ among Chinese team leaders towards the workers on the project site, a lack of protective equipment for workers, a worker strike on October 23, 2017 for better wages and improved working conditions, and non-compliance with the contractual deadlines for the execution of the project.

Additional details

1. This stadium is also known as the Alassane Ouattara Olympic Stadium (Stade Olympique Alassane Ouattara). The Chinese project title is 科特迪瓦阿比让体育场项目 or 艾宾贝奥林匹克体育场施. The French project title is Projet du stade Olympique d'Ebimpé. 2. The RMB 300 million loan agreement can be accessed in its entirety via https://www.dropbox.com/s/rwpk51m9id49llw/EBIMPE%20-ACCORD%20CI%20GOUV%20CHINE.pdf?dl=0.

Number of official sources

21

Number of total sources

30

Download the dataset

Details

Cofinanced

No

Direct receiving agencies [Type]

Government of Côte d'Ivoire (Ivory Coast) [Government Agency]

Implementing agencies [Type]

Beijing Construction Engineering Group Co., Ltd. (BCEG) [State-owned Company]

SOCOTEC International [Private Sector]

Loan Details

Maturity

25 years

Interest rate

0.0%

Grace period

15 years

Grant element (OECD Grant-Equiv)

73.6125%

Bilateral loan

Interest-free loan

Investment project loan