China Eximbank provides $17.47 million loan for Phase 2 of the Rural Electrification Project
Commitment amount
$ 19606443.74764125
Adjusted commitment amount
$ 19606443.75
Constant 2021 USD
Summary
Funding agency [Type]
Export-Import Bank of China (China Eximbank) [State-owned Policy Bank]
Recipient
Togo
Sector
Energy (Code: 230)
Flow type
Loan
Level of public liability
Central government debt
Infrastructure
Yes
Category
Project lifecycle
Description
According to a report published by the Bilateral Cooperation Department of Togo’s Ministry of Planning and Development, the Export-Import Bank of China made loan disbursements worth $34,981,375 in 2015 for two projects: Phase 2 of the Rural Electrification Project (as captured via Project ID#53463) and the 161/66/20 kV Sokodé Substation and Transmission Line Construction Project (as captured via Project ID#72737). Then, in 2016, China Eximbank made a loan disbursement worth $17,470,258 for Phase 2 of the Rural Electrification Project. The loan carried the following estimated borrowing terms: a 1.7806% interest rate, a 7.2732-year grace period, and a 19.7732-year maturity. Phase 2 of the Rural Electrification Project involved the electrification of 39 rural localities in Togo; Togo's Ministry of Mines and Energy was the beneficiary ministry. The precise implementation start and end dates of the project are unknown. The contractor responsible for implementing this project is also unknown.
Additional details
1. The French project title is Electrification rurale phase 2 (39 localités rurales). 2. This China Eximbank loan is not included in the database of Chinese loan commitments that SAIS-CARI released in July 2020. Nor is it included in the the Chinese Overseas Development Finance Dataset published by Boston University’s Global Development Policy Center in December 2020. 3. For the time being, AidData has reported the amount disbursed in 2016 as the transaction (loan commitment) amount since it is unclear how the $34,981,375 disbursement in 2015 was divided between Phase 2 of the Rural Electrification Project and the 161/66/20kV Sokodé Substation and Transmission Line Construction Project. The commitment year is recorded as 2015, as the loan was committed by then, although with the "Year uncertain" box checked in the absence of a confirmed commitment year. 4. The estimated borrowing terms (maturity, grace period, and interest rate) of the loan are drawn from the World Bank's Debtor Reporting System (DRS). See https://www.dropbox.com/s/2sw4f7gluxa52fk/DRS%20Official%20Commitments%20from%20China%20Through%202021.xlsx?dl=0 and https://www.dropbox.com/s/ab8qt4n6jijcbhd/IDS_Average%20interest%20on%20new%20external%20debt%20commitments.xlsx?dl=0 and https://www.dropbox.com/s/949n5rctiue6d7c/IDS_Average_grace_period_and_maturity_on_new_external_debt_commitments.xlsx?dl=0
Number of official sources
3
Number of total sources
4
Details
Cofinanced
No
Direct receiving agencies [Type]
Government of Togo [Government Agency]
Implementing agencies [Type]
Togo Ministry of Mines and Energy [Government Agency]
Government of Togo [Government Agency]
Loan Details
Maturity
20 years
Interest rate
1.7806%
Grace period
7 years
Grant element (OECD Grant-Equiv)
53.5853%