Overview

Chinese Government provides RMB 55 million million grant for Durbar High School (Bhanu Secondary School) Reconstruction Project (Linked to Record ID#43970)

Commitments (Constant USD, 2023)$8,661,105
Commitment Year2017Country of ActivityNepalDirect Recipient Country of IncorporationNepalSectorEmergency ResponseFlow TypeGrant

Status

Project lifecycle

Completion

Pipeline: PledgePipeline: CommitmentImplementationCompletion

Timeline

Key dates

Commitment date
Jan 1, 2017
Start (actual)
Aug 3, 2018
End (actual)
Jan 19, 2020

Geospatial footprint

Map overview

Visualizes the AidData-provided feature geometry for this project.

Loading map…

Durbar High School (also known as Bhanu Secondary School) is located in Ranipokhari within Kathmandu. More detailed locational information can be found at https://www.google.com/maps/place/Durbar+High+School/@27.7078162,85.3141929,15z/data=!4m5!3m4!1s0x0:0x2765fb20876b50d1!8m2!3d27.7078162!4d85.3141929 and https://www.openstreetmap.org/way/300634292

Stakeholders

Organizations involved in projects and activities supported by financial and in-kind transfers from Chinese government and state-owned entities

Funding agencies

Government Agencies

  • China Ministry of Commerce

Receiving agencies

Government Agencies

  • Government of Nepal

Implementing agencies

Government Agencies

  • Government of Nepal

Miscellaneous Agency Types

  • China Aviation Planning and Design Institute

State-owned companies

  • Shanghai Construction Engineering Group (SCG) (上海建工)

Loan desecription

Chinese Government provides RMB 55 million million grant for Durbar High School (Bhanu Secondary School) Reconstruction Project (Linked to Record ID#43970)

Narrative

Full Description

Project narrative

In 2017, the Chinese Government agreed to reconstruct Durbar High School — also known as Bhanu Secondary School — in Ranipokhari within Kathmandu. It has a total construction area of 4200 square meters, with more than 40 classrooms. The school, founded on 1853, was previously damaged by the 2015 earthquake. The school will be reconstructed with a RMB 55 million million grant from the Chinese Government. Shanghai Construction Engineering Group Co., Ltd. is the contractor responsible for construction. China Aviation Planning and Design Institute prepared the school design. The construction project officially started on August 3, 2018. It was expected to last 20 months. The project was ultimately completed on January 19, 2020. This project was part of post-earthquake 25 China-aided recovery projects. For the umbrella project, see Record ID#43970. Durbar High School (also known as Bhanu Secondary School) is located in Ranipokhari within Kathmandu. Its exact locational coordinates are available at https://www.google.com/maps/place/Durbar+High+School/@27.7078162,85.3141929,15z/data=!4m5!3m4!1s0x0:0x2765fb20876b50d1!8m2!3d27.7078162!4d85.3141929