China Eximbank provides $143.9 million preferential buyer’s credit for Second Stage of Phase 1 of the Dushanbe-Dangara Road Reconstruction Project (Linked to Project ID#40063, #40440)
Commitment amount
$ 200448224.23447388
Adjusted commitment amount
$ 200448224.23
Constant 2021 USD
Summary
Funding agency [Type]
Export-Import Bank of China (China Eximbank) [State-owned Policy Bank]
Recipient
Tajikistan
Sector
Transport and storage (Code: 210)
Flow type
Loan
Level of public liability
Central government debt
Infrastructure
Yes
Category
Project lifecycle
Geography
Description
On November 27, 2010, China Eximbank and the Ministry of Finance of the Republic of Tajikistan signed a $143,925,000 preferential buyer’s credit (PBC) agreement [China Eximbank PBC NO.2010 (025) Total No. (132)] for the Second Stage of the Phase 1 of the Dushanbe-Dangara Road Reconstruction Project. The loan carried the following borrowing terms: an interest rate of 2%, a maturity of 20 years, and a grace period of 5 years. The total project cost was $151,500,000, including a contribution of $7,575,000 from the Government of Tajikistan. The project, which was implemented in the design and construction contracting mode, involved road reconstruction, municipal road engineering, tunnels and connecting lines, etc. More specifically, the project supported the reconstruction of a 50.5 km road segment along the 147.64 km Dushanbe-Vahdat-Dangara section of the Dushanbe-Kulma highway (which is also known as the Tajikistan-China highway). It also supported the construction of the 4.43 km Chormagzak Tunnel along the 147.64 km Dushanbe-Dangara section of the Dushanbe-Kulma highway. The road repair project construction period was originally expected to last 24 months, and the tunnel and connection line construction period was originally expected to last 36 months (October 15, 2013). China Road & Bridge Corporation was awarded the implementation contract. Construction began on October 15, 2010, and ths project was completed (after passing final inspection) on October 30, 2013.
Additional details
1. This project is linked to the China Eximbank-financed First Stage and China Eximbank-financed Third Stage of Phase 1 of the Dushanbe-Dangara Road Reconstruction Project (see Project ID#40063, #40440). China Eximbank reportedly provided $243.4 million of debt financing in total for all three stages of Phase 1. 2. The Russian project title for Stage 2 of Phase 1 is Реконструкция второго этапа Фаза I автомобильной дороги «Душанбе-Кульма» (Таджикистан – граница Китая) на участке «Душанбе - Дангара». The Chinese project title is 塔中公路一期(杜尚别—丹卡拉段)道路修复改造项目. 3. The loan agreement can be accessed via http://www.adlia.tj/show_doc.fwx?rgn=36045.
Number of official sources
14
Number of total sources
20
Details
Cofinanced
No
Direct receiving agencies [Type]
Tajikistan Ministry of Finance [Government Agency]
Implementing agencies [Type]
Tajikistan Ministry of Finance [Government Agency]
China Road & Bridge Corporation (CRBC) [State-owned Company]
Loan Details
Maturity
20 years
Interest rate
2.0%
Grace period
5 years
Grant element (OECD Grant-Equiv)
48.97%