ICBC participates in $115 million syndicated loan for 150MW Barker Power Plant Construction Project

Commitments (Constant USD, 2023)$24,474,907
Commitment Year2017Country of ActivityArgentinaDirect Recipient Country of IncorporationArgentinaOverseas JurisdictionArgentinaSectorEnergyFlow TypeLoan

Status

Project lifecycle

Completion

Pipeline: PledgePipeline: CommitmentImplementationCompletion

Timeline

Key dates

Commitment date
Apr 26, 2017
End (actual)
Dec 29, 2017
Last repayment (originally scheduled)
Apr 25, 2022

Geospatial footprint

Map overview

Visualizes the AidData-provided feature geometry for this project.

Loading map…

The purpose of the project was the construction and operation of the Barker power plant in the partido of Benito Juarez and the Province of Buenos Aires. More detailed locational information can be found at https://www.openstreetmap.org/way/947275777 and https://www.openstreetmap.org/way/832824567.

Stakeholders

Organizations involved in projects and activities supported by financial and in-kind transfers from Chinese government and state-owned entities

Ultimate beneficial owners

At least 25% host country ownership

Funding agencies

State-owned Commercial Banks

  • Industrial and Commercial Bank of China (Argentina) Limited (ICBC (Argentina))

Cofinancing agencies

Private Sector

  • BACS Banco de Crédito y Securitización SA
  • Banco de Galicia y Buenos Aires S.A.
  • Banco Hipotecario SA
  • Banco Macro S.A.

Receiving agencies

Joint Venture/Special Purpose Vehicles

  • UGEN S.A.

Implementing agencies

Private Sector

  • General Electric Co. (GE)

Loan desecription

ICBC participates in $115 million syndicated loan for 150MW Barker Power Plant Construction Project

Interest typeUnknownMaturity5 years

Narrative

Full Description

Project narrative

On April 26, 2017, UGEN S.A. — a special purpose vehicle and subsidiary of MSU Energy Group — signed a $115 million syndicated loan agreement with Banco de Galicia y Buenos Aires S.A., Banco Hipotecario S.A., BACS Banco de Crédito y Securitización, Banco Macro S.A., and Industrial and Commercial Bank of China (Argentina) S.A. for the 150MW Barker Power Plant Construction Project. The loan carried a 5 year maturity (final maturity: June 2022) and an unknown interest rate. As of September 30, 2017, the loan’s amount outstanding was $105.7 million was outstanding under this loan, and, as of March 13, 2018, its amount outstanding was $109 million. The purpose of the project was the construction and operation of the gas-fired Barker power plant in the partido of Benito Juarez and the Province of Buenos Aires. The purpose of the power plant itself is to provide electricity to Argentina's national electricity grid, the Argentine Interconnection System (SADI). As such, UGEN S.A. entered into a 10-year Power Purchase Agreement (PPA) for the Barker power plant with Compañía Administradora del Mercado Mayorista Eléctrico S.A. (CAMMESA) – the government entity in Argentina that manages the wholesale energy market and the dispatch of electricity to the SADI – on July 25, 2016. The plant has three General Electric turbo generators (model LM6000-PC Sprint), each with 50 MW of generation capacity. Electricity from the Barker power plant is dispatched to the SADI through the Barker-Olavarría high voltage line. General Electric (Argentina Branch) was the EPC contractor responsible for project implementation. The Barker power plant began operating on December 29, 2017.

Staff comments

1. ICBC’s contribution to the $115 million syndicated loan is unknown. For the time being, AidData assumes equal contributions ($23 million) across the 5 participants in the loan syndicate 2. Per MSU Energy's Offering Memorandum, UGEN's PPA with CAMMESA was amended on October 26, 2017. Additionally, the Committed Date established in the Barker PPA was November 15, 2017. However, pursuant to an amendment to the PPA to change the site of the power plant, the Committed Date was extended to December 30, 2017.