Project ID: 54938

Chinese Government provides RMB 99 million grant for Panama City to David Railway Feasibility Study

Commitment amount

$ 16313505.388938185

Adjusted commitment amount

$ 16313505.39

Constant 2021 USD

Summary

Funding agency [Type]

Unspecified Chinese Government Institution [Government Agency]

Recipient

Panama

Sector

Transport and storage (Code: 210)

Flow type

Grant

Infrastructure

No

Category

Intent

Development (The next section lists the possible statuses.)

Commercial

Development

Representational

Mixed

Financial Flow Classification

ODA-like (The next section lists the possible statuses.)

Official Development Assistance

Other Official Flows

Vague (Official Finance)

Flows categorized based on OECD-DAC guidelines

Project lifecycle

Status

Completion (The next section lists the possible statuses.)

Pledge

Commitment

Implementation

Completion

Suspended

Cancelled

Milestones

Commitment

2018-12-01

Actual complete

2019-03-15

Description

In December 2017, the Chinese Government signed a memorandum of understanding (MOU) with the Government of Panama regarding a feasibility study for a railway line connecting Panama City with the town of David, the capital of Chiriqui province. The Chinese Government reportedly committed RMB 99 million of grant funding for the study. China Railway Design Corporation (CDRC) was the contractor responsible for the feasibility study. It conducted the study in coordination and collaboration with the Panamanian Society of Engineers and Architects (SPIA), the Technological University of Panama, the University of Panama, the Ministry of Housing and Territorial Planning, the Electric Transmission Company and the Panama Metro. The proposed railway would involve the construction of an 8-car passenger and freight train line with 21 stops along a 391.3 km stretch. If completed, it would turn a 6+ hour journey into approximately 2 and a half hours. As of September 2018, the feasibility study was reportedly 80% complete. The results of the study were delivered to the President of Panama on March 15, 2019. It is unclear if the feasibility study will result in a project but time and cost estimates hover around $4.1-5.5 billion and a 6-year completion timeline

Additional details

1. The Spanish project title is Estudio de Factibilidad del Proyecto Ferroviario Panamá-David. 2. The town of David is 50 km from the border with Costa Rica. 3. The MOU can be accessed in its entirety via https://mire.gob.pa/images/PDF/documentos%20y%20formularios/Acuerdoschina/ACUERDO%20DE%20COOP.%20ESTUDIOS%20DE%20FACTIBILIDAD.pdf

Number of official sources

11

Number of total sources

19

Download the dataset

Details

Cofinanced

No

Direct receiving agencies [Type]

Government of Panama [Government Agency]

Implementing agencies [Type]

China Railway Group Limited (CREC) [State-owned Company]