Narrative
Full Description
Project narrative
On December 5th, 2018, a handover ceremony was held for the Chinese-assisted Mabrouka Village Water Tower project. The project was funded through the Chinese Embassy in Chad and was implemented by the Fondation Grand Coeur (“大爱”基金会). The project involved the construction of a 65 meter deep well, a 30 ton water tank, and a solar-powered power supply system. The daily water supply capacity is 80 to 90 cubic meters, and was planned to be activated October 2018.