Chinese Government provides RMB 50 million interest-free loan for Swimming Pool Construction Project
Commitment amount
$ 15500750.036202552
Adjusted commitment amount
$ 15500750.04
Constant 2021 USD
Summary
Funding agency [Type]
China Ministry of Commerce [Government Agency]
Recipient
Morocco
Sector
Other social infrastructure and services (Code: 160)
Flow type
Loan
Level of public liability
Central government debt
Infrastructure
Yes
Category
Project lifecycle
Description
In June 2000, the Chinese Government and the Government of Morocco signed an RMB 50 million interest-free loan agreement for a Swimming Pool Construction Project. The maturity length and grace period of the loan are unknown. It is known that China’s Ministry of Commerce (MOFCOM) was the source of funding. The purpose of the project was to construct three indoor swimming pool in the cities of Kenitra (Kénitra), Fes (Fez), and Marrakech. The indoor swimming pool in Fez is located in the Al Adarissa district, adjacent to the Al Adarissa mosque. China National Complete Plant Import & Export Corp., Ltd. (COMPLANT) was responsible for the design and construction of the three pools. According to MOFCOM, project implementation commenced on June 30, 2002 and ended on January 31, 2005. A project handover certificate was issued on April 22, 2005. The Kenitra (Kénitra) Swimming Pool was completed on March 30, 2004, handed over to the Moroccan authorities on May 6, 2004, and opened and put into use on July 28, 2004. The Fez Swimming Pool was completed in September 2004, handed over to the Moroccan authorities on September 28, 2004, and opened and put into use on December 15, 2004. The Marrakech Swimming Pool was completely handed over to the Moroccan authorities on February 1, 2005. Each pool has six lanes and is 25 meters in length and 15 meters in width. The indoor pool facilities in Fez are equipped with changing rooms, shower rooms, grandstands, offices, depot, café, infirmary, gymnasium, restrooms, and terraces.
Additional details
1. The Chinese project title is 三个游泳馆 or 3个奥林匹克标准室内游泳 or 于肯尼拉、非斯和马拉喀什的3个游泳馆项目 or 援摩洛哥三个游泳馆项目. The French project title is trois piscines couvertes de normes olympiques. 2. This RMB 50 million interest-free loan is not included in the database of Chinese loan commitments that SAIS-CARI published in July 2020. 3. Since the borrowing terms of the interest-free loan are unavailable, AidData has set the maturity to 20 years by default and grace period to 10 years by default, per China's Foreign Assistance White Paper (http://www.cidca.gov.cn/2018-08/06/c_129925064_3.htm) which states that the period of interest-free loans is 20 years, with a drawdown period of 5 years, grace period of 5 years, and repayment over 10 years. AidData treats the drawdown period as providing 5 years of additional grace.
Number of official sources
7
Number of total sources
16
Details
Cofinanced
No
Direct receiving agencies [Type]
Government of Morocco [Government Agency]
Implementing agencies [Type]
China National Complete Plant Import & Export Corporation Group (COMPLANT) [State-owned Company]
Loan Details
Maturity
20 years
Interest rate
0.0%
Grace period
10 years
Grant element (OECD Grant-Equiv)
62.9902%