Overview

China Eximbank provides RMB 340 million government concessional loan for the Bugesera International Airport Road (Sonatubes-Gahanga-Akagera) Project

Commitments (Constant USD, 2023)$51,730,927
Commitment Year2018Country of ActivityRwandaDirect Recipient Country of IncorporationRwandaSectorTransport And StorageFlow TypeLoan

Status

Project lifecycle

Completion

Pipeline: PledgePipeline: CommitmentImplementationCompletion

Timeline

Key dates

Commitment date
Jul 23, 2018
Start (actual)
Mar 8, 2019
End (actual)
Sep 1, 2022
First repayment
Jul 21, 2025
Last repayment
Jul 18, 2038

Geospatial footprint

Map overview

Visualizes the AidData-provided feature geometry for this project.

Loading map…

The project constructs two sections of roads to improve access to the Bugesera International Airport. The first section expands a 13.8km road between the Sonatubes intersection in Kicukiro to the Akagera River Bridge along NR5. The second section continues construction from the Akagera River Bridge to the Bugesera International Airport. Both sections will consist of the expansion of the roads and the beautification of the surrounding area. More detailed locational information can be found at: First Section: https://www.openstreetmap.org/way/618816014#map=14/-2.0413/30.1063 https://www.openstreetmap.org/way/570870728#map=15/-2.0138/30.0998 https://www.openstreetmap.org/way/570876711#map=15/-1.9915/30.0981 https://www.openstreetmap.org/way/569683181#map=16/-1.9739/30.1098 Second Section: https://www.openstreetmap.org/directions?engine=fossgis_osrm_car&route=-2.0624%2C30.0868%3B-2.1192%2C30.1703#map=13/-2.1042/30.1188

Stakeholders

Organizations involved in projects and activities supported by financial and in-kind transfers from Chinese government and state-owned entities

Ultimate beneficial owners

At least 25% host country ownership

Funding agencies

State-owned Policy Banks

  • Export-Import Bank of China (China Eximbank)

Receiving agencies

Government Agencies

  • Government of Rwanda

Implementing agencies

Government Agencies

  • Chinese Embassy
  • Rwanda's Ministry of Infrastructure

State-owned companies

  • China Road & Bridge Corporation (CRBC)

Loan desecription

China Eximbank provides RMB 340 million government concessional loan for the Bugesera International Airport Road (Sonatubes-Gahanga-Akagera) Project

Grace period7 yearsGrant element56.0077%Interest rate (t₀)2%Interest typeFixed Interest RateMaturity20 years

Narrative

Full Description

Project narrative

On July 23, 2018, the Government of Rwanda and the People’s Republic of China today signed a preferential loan framework agreement for the Bugesera International Airport Road (Sonatubes-Gahanga-Akagera) Project. On the same day, China Eximbank and the Government of Rwanda signed an RMB 340 million ($50,300,000) government concessional loan (GCL) agreement [CHINA EXIMBANK GCL NO.(2018) 19 TOTAL No.(661)] for the Bugesera International Airport Road (Sonatubes-Gahanga-Akagera) Project. The GCL carries the following borrowing terms: a 20 year maturity, a 7 year grace period, a 2% interest rate, a 0% default (penalty) interest rate, a 0.25% commitment fee, and a 0.25% (RMB 850,000) management fee. The borrower is expected to use the proceeds of the GCL to finance a $53,954,298.50 commercial contract [ID# 003/RTDA/018] between Rwanda Transport Development Agency (RTDA) and China Road and Bridge Corporation (CRBC), which was signed on March 29, 2018. The purpose of this project is to build an expressway (4-lane dual-carriageway) that links the urban area of Kigali to a new airport (Bugesera International Airport), thereby relieving traffic congestion, saving transit time of tourists and cargos, and increasing the tourism revenue. The project consists of two sections: the first section is from the Sonatubes Intersection to a crossing of Akagera River (Akagera Bridge), and the second section is from Akagera Bridge to Bugesera International Airport (BIA). The first section is a part of rehabilitation of National Road (NR5) Kicukiro-Nemba. China Road and Bridge Corporation is the EPC contractor responsible for project implementation. Construction began March 8, 2019. As of September 2, 2021, the project had achieved an 80% completion rate. As of December 2021, the project had achieved a 96.1% completion rate. By September 19 2022, the project had reached completion and was reported to have helped ease traffic. Emile Patrick Baganizi, the Deputy Director General of Rwanda Transport Development Agency, has attributed the project’s smooth implementation to RTDA’s role in compensating the expropriation of properties and supervising construction works.

Staff comments

1. The China Eximbank loan agreement can be accessed in its entirety via https://www.dropbox.com/s/3qur0qvr2mtiges/China%20Eximbank%20loan%20agreement%20for%20the%20%20Bugesera%20International%20Airport%20Road%20Project.pdf?dl=0. 2. In the database of Chinese loan commitments that SAIS-CARI released in July 2020, it does not identify the borrowing terms of the China Eximbank loan [a 20 year maturity, a 7 year grace period, a 2% interest rate, a 0.25% commitment fee, and a 0.25% (RMB 850,000) management fee] that was issued for this project. AidData relies on the borrowing terms that are identified in the loan agreement itself. 3. This project is also known as the Upgrading of Sonatubes-Gahanga-Akagera Road Project. The Chinese project title is 卢旺达新机场路升级改造项目.