China Eximbank provides $102.5 million preferential buyer’s credit for Santa Elena Aqueduct Hydraulic Plan Stage 1 Project

Commitments (Constant USD, 2023)$111,872,243
Commitment Year2016Country of ActivityEcuadorDirect Recipient Country of IncorporationEcuadorSectorWater Supply And SanitationFlow TypeLoan

Status

Project lifecycle

Completion

Pipeline: PledgePipeline: CommitmentImplementationCompletion

Timeline

Key dates

Commitment date
Nov 17, 2016
End (actual)
Aug 27, 2019
First repayment (originally scheduled)
Nov 16, 2021
Last repayment (originally scheduled)
Nov 12, 2036

Geospatial footprint

Map overview

Visualizes the AidData-provided feature geometry for this project.

Loading map…

The purpose of the project is to expand the existing infrastructure of the Daule-Santa Elena transfer system from 4.6 m3/s to 27.6 m3/2 to meet the demands for drinking water and irrigation. More detailed location information can be found at: https://www.openstreetmap.org/relation/109441#map=10/-2.0882/-80.6056

Stakeholders

Organizations involved in projects and activities supported by financial and in-kind transfers from Chinese government and state-owned entities

Ultimate beneficial owners

At least 25% host country ownership

Funding agencies

State-owned Policy Banks

  • Export-Import Bank of China (China Eximbank)

Receiving agencies

Government Agencies

  • Government of Ecuador

Implementing agencies

State-owned companies

  • Changjiang Institute of Survey, Planning, Design and Research (CISPDR)
  • China International Water and Electrical Corporation (CWE)

Loan desecription

China Eximbank provides $102.5 million preferential buyer’s credit for Santa Elena Aqueduct Hydraulic Plan Stage 1 Project

Grace period5 yearsGrant element46.2598%Interest rate (t₀)3%Interest typeFixed Interest RateMaturity20 years

Narrative

Full Description

Project narrative

On January 7, 2015, China Eximbank and the Government of the Republic of Ecuador signed a framework agreement on future cooperation, which identified a list of priority project for financing, including the Santa Elena Aqueduct Hydraulic Plan Stage 1 Project. Then, on November 17, 2016, China Eximbank and the Government of the Republic of Ecuador signed a preferential buyer's credit (PBC) loan agreement [CHINA EXIMBANK PBC NO. (2016) 33 TOTAL NO. (421) SERIAL NO: 1420303052016212684] worth $102,567,186.91 for the Santa Elena (also Santa Ana) Aqueduct Hydraulic Plan Stage One Project. The loan (PBC) carries the following borrowing terms: an interest rate of 3%, a default (penalty) interest rate of 0%, a grace period of 5 years, a maturity of 20 years, a 0.75% commitment fee, a 0.75% management fee, and a 0% default (penalty) interest rate. The borrower was expected to use the proceeds of the loan to finance 85% of the cost of two commercial contracts: a $112,547,650.97 construction contract (ID#RE-EEI-EPA-021-2015] between Empresa Publica del Agua EPA-EP and China International Water & Electric Corporation (CWE), which was signed on December 30, 2015; and a $8,119,627.75 supervision contract (ID#RE-EEI-EPA-009-2015] between Empresa Publica del Agua EPA-EP and Changjiang Institute of Survey, Planning, Design, and Research (CISPDR), which was signed on December 31, 2015. The loan’s (principal) amount outstanding was $102,567,186.89 as of December 31, 2021 and $99,148,280.66 as of November 30, 2022. The project was part of the Intervention, Expansion, and Construction of the Hydraulic Plan of Santa Elena Aqueduct, which was broken into Phase 1 & Phase 2. It involved an expansion of the existing infrastructure of the Daule-Santa Elena transfer system from 4.6 m3/s to 27.6m3/2 to meet the demands for drinking water and irrigation. CWE was the contractor responsible for project implementation. Its work was supervised by Changjiang lnstitute of Survey, Planning, Design and Research (CISPDR). The project, which had a planned construction period of 27 months, was completed on August 27, 2019.

Staff comments

1. The loan (PBC) agreement can be accessed in its entirety via https://www.dropbox.com/s/npl1draoc4oghzu/2016%20China%20Eximbank%20Loan%20for%20Santa%20Elene%20Aqueduct%20Hydraulic%20Plan%20Stage%20One%20Project.pdf?dl=0 and https://www.dropbox.com/scl/fi/qvszjckmuuh2i0dntkqqa/Anexo-3-Acuerdo-Marco-Cooperaci-n-Ecuador-Eximbank.pdf?rlkey=n2b208fdefqvv15cwmjb0jw0m&dl=0 2. Some media reports suggestions that the financing for this project came from a $5.3 billion line of credit that China Eximbank issued in 2015 (captured via Record ID#39113), but AidData has not identified any official sources that corroborate this assertion. 3. This project is also known as the Hydraulic Plan for lntervention, Extension and Construction of Santa Elena Aqueduct (PHASE), Stage 1. The Chinese project title is 署的圣埃伦娜水工程项目. The Spanish title is Plan Hidráulico Acueducto Santa Elena (PHASE 1). 4. The Ecuadorian Ministry of Finance loan identification number is 23187000. 5. An ex ante (expected) amortization table from the Ecuadorian Ministry of Finance can be accessed via https://www.dropbox.com/scl/fi/jg25uklcinkl2azyb7tfk/Anexo-24-Tabla-de-amortizaci-n.pdf?rlkey=zhdw176rnrtirwf0n880ky09n&dl=0 6. The January 7, 2015 framework agreement can be accessed in its entirety via https://www.dropbox.com/scl/fi/qvszjckmuuh2i0dntkqqa/Anexo-3-Acuerdo-Marco-Cooperaci-n-Ecuador-Eximbank.pdf?rlkey=n2b208fdefqvv15cwmjb0jw0m&dl=0