Project ID: 58682

Chinese Government provides RMB 130 million grant for Bamako International Conference Center Renovation Project (Linked to Project ID#58690 and ID#73239)

Commitment amount

$ 23358305.57554184

Adjusted commitment amount

$ 23358305.58

Constant 2021 USD

Summary

Funding agency [Type]

China Ministry of Commerce [Government Agency]

Recipient

Mali

Sector

Business and other services (Code: 250)

Flow type

Grant

Infrastructure

Yes

Category

Intent

Development (The next section lists the possible statuses.)

Commercial

Development

Representational

Mixed

Financial Flow Classification

ODA-like (The next section lists the possible statuses.)

Official Development Assistance

Other Official Flows

Vague (Official Finance)

Flows categorized based on OECD-DAC guidelines

Project lifecycle

Status

Completion (The next section lists the possible statuses.)

Pledge

Commitment

Implementation

Completion

Suspended

Cancelled

Milestones

Commitment

2014-01-01

Actual start

2017-02-28

Actual complete

2019-01-26

Geography

Description

On August 16, 2016, the Deputy Director of the Bureau of International Economic Cooperation from China’s Ministry of Commerce, Zeng Huacheng, and visiting Malian Ministry of Culture consultant Mr. Bouraima Fofana signed an implementation agreement for the Bamako International Conference Center Renovation Project. The total cost of the project was RMB 170 million (17 billion CFA francs). Approximately RMB 130 million (13 billion francs) was financed through a grant from China’s Ministry of Commerce and approximately RMB 40 million (4 billion CFA francs) was financed through an interest-free loan from the China’s Ministry of Commerce. The grant funding was drawn from an economic and technical cooperation agreement (ETCA) that the two government signed on February 24 and December 22, 2014. Project ID#58682 captures the grant commitment for this project and Project ID#73239 captures the interest-free loan for this project. The Bamako International Conference Center has a total construction area of approximately 11,800 square meters, and the renovation project focused on repairing the conference building, administrative office building, power distribution room, outdoor pipelines and road squares, and upgrading the air conditioning system, conference system, and security system. China Railway Engineering Design Consulting Group Co., Ltd. was responsible for project design and management. China State Construction Engineering Corporation was the contractor responsible for project implementation. On February 20, 2017, the Ministry of Culture made the CICB buildings available to the China Economic and Social Council (CESC) so that work could begin on February 28, 2017 and continue for an estimated 24 months. The CICB officially reopened on January 26, 2019. The construction of the CICB was financed by the Chinese Government. The Chinese Government subsequently provided funding for its maintenance in in 2005 and 2007 (captured in Project ID#58690 and ID#58686).

Additional details

The Chinese project title is 马里巴马科国际会议中心维修项目.

Number of official sources

9

Number of total sources

10

Download the dataset

Details

Cofinanced

No

Direct receiving agencies [Type]

Government of Mali [Government Agency]

Implementing agencies [Type]

China Railway Design Corporation (CRDC) [State-owned Company]

Government of Mali [Government Agency]

China State Construction Engineering Corporation (CSCEC) [State-owned Company]