Narrative
Full Description
Project narrative
In 2008, China Eximbank issued a $3.003 billion general buyer's credit loan to Sino–Congolais des Mines (Sicomines SARL) — a joint venture — to finance infrastructure projects in the DRC (as captured via Record ID#450). All subsidiary borrowings under the (government-guaranteed) general buyer's credit loan agreement were to be repaid with revenues from mining projects managed by Sicomines SARL. Each subsidiary loan carried a maturity of 25 years, a grace period of 10 years, and an interest rate of 6-month LIBOR plus a 1% margin (or 3.839% at the time of the agreement). All infrastructure projects supported through the general buyer's credit loan were part of the so-called “Sino-Congolese Programme." One of the subsidiary loans issued as part of the 'Sino-Congolese Programme' was a $19,341,204.19 loan for Boulevard 30 Juin Construction (Lot 2) Project. The loan ultimately achieved a disbursement rate of 97.4% ($18,856,314.75 out of $19,341,204.19). The purpose of the Boulevard 30 Juin Construction (Lot 2) Project was to improve traffic flow and conditions on the 2.5km stretch of Boulevard du 30 Juin between Central Station and Kintambo Magasin. China Railway Engineering Corporation (CREC) was the contractor responsible for implementation. It was awarded a contract (ID#ACGT/DG/DT/2/2004/2009) on December 9, 2009. Construction began on February 8, 2011 and ended on July 23, 2014. The project’s originally scheduled completion date was January 25, 2013.
Staff comments
1. The French project title is Travaux sur le boulevard du 30 juin lot 2. The Chinese project title is 630大道二期项目. 3. The Boulevard 30 Juin Construction (Lot 1) Project is captured via Record ID#59429. 4. Given that AidData has captured the entire $3.003 billion China Eximbank loan commitment amount for multiple infrastructure projects via Record ID#450, it does not record a financial commitment (transaction) amount for the subsidiary loan supporting this project to avoid double-counting.