[Sino-Congolese Programme] China Eximbank provides funding for technical studies of Kalemie Road Rehabilitation and Modernization Project (Linked to Project ID#450, #59214, #85273)

Summary

Funding agency [Type]

Export-Import Bank of China (China Eximbank) [State-owned Policy Bank]

Recipient

Congo (DRC)

Sector

Transport and storage (Code: 210)

Flow type

Vague TBD

Infrastructure

Yes

Category

Intent

Development (The next section lists the possible statuses.)

Commercial

Development

Representational

Mixed

Financial Flow Classification

ODA-like (The next section lists the possible statuses.)

Official Development Assistance

Other Official Flows

Vague (Official Finance)

Flows categorized based on OECD-DAC guidelines

Project lifecycle

Status

Implementation (The next section lists the possible statuses.)

Pledge

Commitment

Implementation

Completion

Suspended

Cancelled

Milestones

Commitment

2017-01-01

Actual start

2020-10-27

Geography

Description

In 2008, China Eximbank issued a $3 billion line of credit to Sino–Congolais des Mines (Sicomines SARL) — a joint venture — to finance infrastructure projects in the DRC (see Project ID#450). All borrowings through this line of credit (framework agreement) are repaid with revenues from mining projects managed by Sicomines SARL. Each subsidiary loan issued through the line of credit carries a maturity of 25 years, a grace period of 10 years, and an interest rate of 6-month LIBOR plus a 1% margin (or 3.839% at the time of the agreement). The infrastructure projects that are supported by this line of credit are collectively referred to as the ‘Sino-Congolese Programme’. One of the subsidiary projects under the ‘Sino-Congolese Programme’ was the funding of the technical studies for the Kalemie Road Rehabilitation and Modernization Project (Voirie de Kalemie) in 2017. Democratic Republic of Congo Agence Congolaise des Grands Travaux (ACGT) was the implementing agency. The nature of the financial commitment for this project is unknown. The first section of the Kalemie Road Rehabilitation and Modernization Project was completed and started operations on Oct 27, 2020.

Additional details

1. The French name for this project is Etudes techniques du pont sur la rivière Kalemie et de vérification des travaux d'assainissement de la voirie de Kalemie. 2. Phase 1 of the construction of the Kalemie Road Rehabilitation and Modernization Project is captured via Project ID#59214. Phase 2 is captured via Project ID#85273.

Number of official sources

3

Number of total sources

5

Download the dataset

Details

Cofinanced

No

Direct receiving agencies [Type]

Sino–Congolais des Mines (Sicomines SARL) [Joint Venture/Special Purpose Vehicle]

Implementing agencies [Type]

Democratic Republic of Congo Agence Congolaise des Grands Travaux (ACGT) [Government Agency]

Government of Democratic Republic of Congo [Government Agency]