China Development Bank provides $47,337,800 loan to State Grid Brazil Holding S.A. (Linked to Record ID#106214 and #106215)

Commitments (Constant USD, 2023)$48,547,431
Commitment Year2014Country of ActivityBrazilDirect Recipient Country of IncorporationBrazilSectorEnergyFlow TypeLoan

Status

Project lifecycle

Pipeline: Commitment

Pipeline: PledgePipeline: CommitmentImplementationCompletion

Timeline

Key dates

Commitment date
Nov 17, 2014
Last repayment (originally scheduled)
Dec 30, 2023

Geospatial footprint

Map overview

Visualizes the AidData-provided feature geometry for this project.

Loading map…

The Belo Monte ±800 kV UHVDC transmission line (also known as the Xingu-Estreito UHVDC transmission line) is a 800 kV high-voltage direct current transmission line in Brazil between the Xingu substation at the city of Anapu in the Pará state, 17 km from the Belo Monte Dam, and the Estreito substation at the city of Ibiraci in the Minas Gerais state. Some sources identify it as being 2076 km in length and others identify it as being 2518 km in length. More detailed locational information can be found at https://en.wikipedia.org/wiki/Xingu-Estreito_HVDC_transmission_line and https://www.google.com/maps/place/UHBM/@-3.128871,-51.7811079,17z/data=!3m1!4b1!4m5!3m4!1s0x9293c3f9d7d58bd5:0xe83006090c1f1975!8m2!3d-3.1288764!4d-51.7789192 and https://www.google.com/maps/place/Subesta%C3%A7%C3%A3o+Estreito+-+Esta%C3%A7%C3%A3o+Conversora+Sistema+Belo+Monte/@-20.2591277,-47.1807065,17z/data=!4m9!1m2!2m1!1zU3ViZXN0YcOnw6NvIEVzdHJlaXRv!3m5!1s0x94b0947ce942f5b7:0x9b7209659efdf380!8m2!3d-20.2591277!4d-47.178518!15sChVTdWJlc3Rhw6fDo28gRXN0cmVpdG-SARVlbGVjdHJpY2FsX3N1YnN0YXRpb24 and https://www.openstreetmap.org/way/515552863#map=16/-3.1066/-51.6889 and https://www.openstreetmap.org/way/516496552#map=16/-20.2593/-47.1778 and https://www.openstreetmap.org/way/700752757 and https://www.openstreetmap.org/way/700752758#map=6/-11.253/-48.048 and https://www.openstreetmap.org/way/673142033#map=6/-13.065/-47.730

Stakeholders

Organizations involved in projects and activities supported by financial and in-kind transfers from Chinese government and state-owned entities

Ultimate beneficial owners

At least 25% Chinese ownership

Funding agencies

State-owned Policy Banks

  • China Development Bank (CDB)

Receiving agencies

State-owned companies

  • State Grid Brazil Holding S.A. (SGBH)

Loan desecription

China Development Bank loans $47,337,800 to State Grid Brazil Holding S.A.

Grant element23.7218%Interest rate (t₀)3.2%Interest typeVariable Interest RateMaturity10 years

Narrative

Full Description

Project narrative

On November 17, 2014, China Development Bank provided a $47,337,800 loan to State Grid Brazil Holding S.A. for its subsidiary Ribeirão Preto Transmissora de Energia S.A. (RPTE). The loan has an interest rate of LIBOR + 2.85% (Nov. 2014 6 month LIBOR average + 2.85 = 3.177%). Principal and interest payments will be in 21 semi-annual installments beginning on December 2014 and with final maturity on September 4, 2024. In June 2016, due to cash problems, the company failed to pay the principal due at the time and only paid the interest. The company and CDB negotiated to repay the debt owed then in June 2017 (Linked to Record ID#106214). In December 2016, payment was made as stipulated. In 2017, payments were made as stipulated. In 2018, due to low cash flow, the company failed to pay the principal again in Decemeber. On December 18, 2018, the company and CDB entered into a debt rescheduling agreement in which they agreed to extend the maturity period by 2.8 years, maturing on June 20, 2027 (Linked to Record ID#106215). In 2019, the company paid principal and interest according to the new debt payment curve. In 2020, the company paid principal and interest in June and in December it paid only interest. For the payment of the principal, due to the economic crisis caused by COVID-19 and based on the loan agreement which states that the Concessionaire has the right to decide whether or not to pay the loans on the due dates, depending on the financial and operational situation of the company, we are reviewing our strategies for the coming years. On September 30, 2021, the parent company State Grid Brazil Holding (SGBH) assumed the rest of balance, effectively eliminating Ribeirão Preto Transmissora de Energia S.A.’s obligations. By way of background, in December 2010, State Grid Corporation of China acquired 100% stakes in seven Brazilian transmission concession companies through its wholly owned Brazilian subsidiary, State Grid Brazil Holding S.A. (“SGBH”), each with a secured 30-year operating right. The assets in these companies at the time of acquisition included transmission lines with a total length of 3,176 km, six 500 kV substations, two 500 kV switching stations and one 345 kV substation. SGBH assumed responsibility for operating these 7 transmission companies. Then, in May 2012, SGBH entered into an agreement to acquire another seven Brazilian transmission concession companies, each with a secured 30-year operating right. The seven companies’ assets at the time of acquisition included transmission lines with a total length of 2,792 km, 11 self-owned substations and 12 substations jointly controlled with others. These activities and other electricity transmission projects — including the 2,518 km Belo Monte ±800 kV UHVDC Transmission Project (or 巴西美丽山水电特高压直流送出二期项 or ±800千伏特高压直流输电工程) — have been supported by China Development through a series of loans.