ICBC provides CFA 80.75 billion loan for Phase 1 of San Pedro University Construction Project

Commitments (Constant USD, 2023)$146,227,147
Commitment Year2018Country of ActivityCote d'IvoireDirect Recipient Country of IncorporationCote d'IvoireSectorEducationFlow TypeLoan

Status

Project lifecycle

Completion

Pipeline: PledgePipeline: CommitmentImplementationCompletion

Timeline

Key dates

Commitment date
Jan 1, 2018
Start (actual)
Nov 30, 2018
End (planned)
Sep 1, 2020
End (actual)
Mar 19, 2021

Geospatial footprint

Map overview

Visualizes the AidData-provided feature geometry for this project.

Loading map…

The purpose of the project was to construct a new university town — consisting of consists of more than 100 buildings — in the city of San-Pedro (San Pedro). The 302-hectare project includes teaching spaces, recreational, leisure, sports and cultural spaces, a library, an accommodation campus with a kitchen and restaurants. More detailed locational information can be found at https://www.openstreetmap.org/way/957842111#map=16/4.7874/-6.6984

Stakeholders

Organizations involved in projects and activities supported by financial and in-kind transfers from Chinese government and state-owned entities

Ultimate beneficial owners

At least 25% host country ownership

Funding agencies

State-owned Commercial Banks

  • Industrial and Commercial Bank of China (ICBC)

Receiving agencies

Private Sector

  • Envol Partnerships Côte d'Ivoire Branch (Envol Immoblier)

Implementing agencies

Government Agencies

  • Cote d'Ivoire Ministry of Higher Education and Scientific Research

Private Sector

  • Envol Partnerships Côte d'Ivoire Branch (Envol Immoblier)

State-owned companies

  • Weihai International Economic & Technical Cooperative Co., Ltd (WIETC)

Guarantors

Government Agencies

  • Government of Côte d'Ivoire (Ivory Coast)

Loan desecription

ICBC provides CFA 80.75 billion loan for Phase 1 of San Pedro University Construction Project

Interest typeUnknown

Narrative

Full Description

Project narrative

On September 10, 2018, Envol Partenariats-Côte d'Ivoire (Envol Partenariats CI)— a subsidiary of the Senegalese group Envol Immobilier — and the Government of Cote d'Ivoire a signed public-private partnership (PPP) agreement for Phase 1 of the San Pedro University Construction Project. Under the terms of the 16-year concession agreement, Envol Partenariats-Côte d'Ivoire was given responsibility for the financing, construction, and operation of the construction of the University of San Pedro (Universite de San Pedro, USP, 圣佩德罗大学). The Industrial and Commercial Bank of China (ICBC) agreed to provide a loan to Envol Partenariats CI for Phase 1 of San Pedro University Construction Project. The proceeds of the loan were to be used by the borrower to finance 85% of the cost of a CFA 95 billion (EUR 128 million) EPC contract between Envol Partenariats-Côte d'Ivoire and Weihai International Economic & Technical Cooperative (WIETC). The Government of Cote d'Ivoire agreed to issue a sovereign guarantee in support of this loan. To facilitate repayment of the ICBC loan, the Government of Cote d'Ivoire also agreed to pay rent to Envol Partenariats CI over a period of fifteen years. The purpose of the project was to construct a new university town — consisting of consists of more than 100 buildings — in the city of San-Pedro (San Pedro). The 302-hectare project includes teaching spaces, recreational, leisure, sports and cultural spaces, a library, an accommodation campus with a kitchen and restaurants. The San Pedro University Construction Project is divided into four phases, with a total land area of 500,584.31m2 and a total building area of 205,071.33m2. Upon completion, San Pedro University is expected to accommodate 20,000 students. Phase 1 involved the construction of 40 buildings that can accommodate 3,000 students. Weihai International Economic & Technical Cooperative (WIETC) was the general EPC contractor responsible for Phase 1 implementation. However, there is also some evidence that China Communications Construction Company, Ltd. (CCCC), China Railway 19th Bureau Group Co Ltd, China Railway Urban Construction Group Co., Ltd. (中铁城建集团有限公司) were involved in Phase 1 implementation. A foundation stone laying ceremony took place on November 30, 2018. When the Ivorian Minister of Education inspected the project site in February 2020, construction activities were underway. The project encountered implementation delays in 2020 due to the COVID-19 pandemic. However, construction was completed on March 19, 2021. A grand opening ceremony for the University of San-Pedro subsequently took place on October 19, 2021.

Staff comments

1. The Chinese project title is 科特迪瓦圣佩德罗大学项目 or 科特迪瓦圣佩德罗体育场馆项目 or 科特迪瓦圣佩德罗体育场项目. The French project title is Nouveau Campus de San-Pédro or Les travaux de construction de l'Université de San Pedro or Project de la première tranche de l'université de San Pedro « USP-I» or Nouveau campus de San-Pédro 2. The overall project cost is 95 billion CFA, so 85% is 80.75 billion CFA (see: CNP-PPP pg. 5-6). 3. The PPP agreement (16-year concession agreement) was approved by the Council of Ministers on September 12, 2018. 4. It is unclear if ICBC only agreed to finance Phase 1 or Phase 1 and subsequent phases of the project. Several media reports indicate that ICBC ‘abruptly withdrew’ from the San Pedro University Construction Project in March 2021, forcing Envol Partenariats CI to turn to Nigeria's UBA and BNI as alternative lenders. However, given that Phase 1 was complete as of March 19, 2021, it seems unlikely that ICBC’s loan commitment for Phase 1 was suspended or canceled. It seems more likely that ICBC decided not to finance subsequent phases of the project. However, this issue merits further investigation. 5. The ICBC loan for Phase 1 of the San Pedro University Construction Project is not included in the Chinese Loans to Africa (CLA) database that is managed by the Global Development Policy Center at Boston University and SAIS-CARI.