Narrative
Full Description
Project narrative
On May 16, 2017, China Eximbank and the Government of Cambodia's Ministry of Economy and Finance signed an RMB 671,067,000 government concessional loan (GCL) agreement for the Nak Leoung-Thnal Torteung Section of National Road No. 11 (NR 11) Construction Project. The GCL carried the following terms: a 20-year maturity, a 7-year grace period, and a 1.25% interest rate. The proceeds of the GCL were to be used by the borrower to finance an EPC (commercial) contract with China Road and Bridge Corporation (CRBC). The purpose of the project is to construct a 96.48 km segment of National Road No. 11 (NR 11) that runs from Nak Leoung to Thnal Torteung. NR 11 connects National Road 1 (NR 1) in Prey Veng Province to National Road 7 (NR 7) in Tbong Khmum province. CRBC was the EPC contractor responsible for implementation. The project entered implementation on March 23, 2018, and it was originally expected to reach completion on September 16, 2020. Cambodia’s Minister of Public Works and Transport Sun Chanthol conducted an-site project inspection on May 4, 2020. On December 6, 2021, the Cambodia National Highway was officially opened to traffic.
Staff comments
1. This project is also known as the National Highway 11 Reconstruction Project and the Construction of National Road No. 11 (NR 11) Project from Nak Leoung to Thnal Torteung. The Chinese project title is 柬11号公路建设项目. The Khmer project title is ផ្លុវ សែនតសូ. 2. The China Eximbank loan that supported this project is not included in the Overseas Development Finance Dataset that Boston University’s Global Development Policy Center published in December 2020.