China Eximbank provides additional $68.9 million preferential buyer’s credit for Surabaya-Madura Island Bridge Construction Project (Linked to Record ID#34757)

Commitments (Constant USD, 2023)$138,098,373
Commitment Year2005Country of ActivityIndonesiaDirect Recipient Country of IncorporationIndonesiaSectorTransport And StorageFlow TypeLoan

Status

Project lifecycle

Completion

Pipeline: PledgePipeline: CommitmentImplementationCompletion

Timeline

Key dates

Commitment date
Nov 5, 2005
Start (actual)
Nov 19, 2005
End (actual)
Jun 10, 2009
First repayment
Nov 3, 2012
Last repayment
Nov 1, 2020

Geospatial footprint

Map overview

Visualizes the AidData-provided feature geometry for this project.

Loading map…

The purpose of the project was to construct the 5.4 kilometer long, 30 meter wide bridge linking the city of Suramadu with Madura Island (exact locational coordinates: 7°11′3″S 112°46′49″E). It is the first bridge to cross the Madura Strait. More detailed locational information can be found at https://www.openstreetmap.org/way/34156658#map=14/-7.1841/112.7803

Stakeholders

Organizations involved in projects and activities supported by financial and in-kind transfers from Chinese government and state-owned entities

Ultimate beneficial owners

At least 25% host country ownership

Funding agencies

State-owned Policy Banks

  • Export-Import Bank of China (China Eximbank)

Receiving agencies

Government Agencies

  • Government of Indonesia

Implementing agencies

State-owned companies

  • China Harbour Engineering Co., Ltd. (CHEC)
  • China Road & Bridge Corporation (CRBC)
  • PT Adhi Karya (Persero) Tbk. (Adhi)
  • PT Waskita Karya (Persero) Tbk

Loan desecription

China Eximbank provides additional $68.9 million preferential buyer’s credit for Surabaya-Madura Island Bridge Construction Project

Grace period7 yearsGrant element44.3229%Interest rate (t₀)3%Interest typeFixed Interest RateMaturity15 years

Narrative

Full Description

Project narrative

In June 2004, China Eximbank and the Government Indonesia signed a memorandum of understanding regarding a loan for the Surabaya-Madura Island Bridge Construction Project. Then, on November 5, 2004, China Eximbank and the Government of Indonesia signed a $160.2 million preferential buyer’s credit (PBC) agreement (#BLA04082) for the Surabaya-Madura Island Bridge Construction Project (captured in Record ID#34757). The PBC carried the following borrowing terms: a maturity period of 15 years, a grace period of 7 years, and an interest rate of 3%. The proceeds from the PBC were to be used by the borrower to partially finance an EPC contract with China Road and Bridge Corporation (CRBC), which was signed on September 24, 2004. On November 5, 2005, China Eximbank provided an additional $68.9 million to the Government of Indonesia for the Surabaya-Madura Island Bridge Construction Project through an amendment to the PBC agreement that became effective on September 13, 2005. The additional PBC proceeds were to be used by the borrower to partially finance a supplemental commercial (EPC) contract worth $83.453 million between CRBC and the Ministry of Public Works of Indonesia, which was signed on July 9, 2008. The purpose of the project was to construct the 5.4 kilometer long, 30 meter wide bridge linking the city of Suramadu with Madura Island (exact locational coordinates: 7°11′3″S 112°46′49″E). It is the first bridge to cross the Madura Strait. The cable-stayed portion has three spans with lengths 192 meters (630 ft), 434 meters (1,424 ft), and 192 meters (630 ft). The bridge has two lanes in each direction plus an emergency lane and a dedicated lane for motorcycles in each direction. CRBC was the general (EPC) contractor responsible for implementation. However, China Harbor Engineering Co. Ltd. and a consortium of Indonesian companies, PT Adhi Karya and PT Waskita Karya, were also involved in implementation (most likely as subcontractors). Construction began on November 19, 2005. The main span of Suramadu Bridge linking Surabaya in East Java mainland and Madura Island was connected successfully at midnight local time on Tuesday, March 31, 2009. The bridge was officially open to traffic on June 10, 2009. Within a week of the opening, it was discovered that nuts and bolts as well as maintenance lamps had been stolen and that there was evidence of vandalism of cables supporting the main span. As is often the case with public sector infrastructure facilities in Indonesia, there has been pressure to keep the tariffs for use of the bridge low. Tolls were initially set at Rp30,000 (USD $3 in 2009) for four-wheeled vehicles and Rp3,000 (USD $0.30) for two-wheelers. However, in early 2016, it was announced that President Jokowi favored a 50% cut in the tolls to help promote the competitiveness of industries on the Madura side of the bridge. On October 27, 2018, toll tariffs were abolished for all types of vehicles.

Staff comments

1. This project is also known as the Suramadu Bridge Project or the Surabaya-Madura Bridge Project. The Chinese project title is 泗水-马都拉大桥 or 印尼泗水-马都拉大桥项目. 2. The China Eximbank loan that supported this project is not included in the Overseas Development Finance Dataset that Boston University’s Global Development Policy Center published in December 2020.