Project ID: 61427

China Eximbank provided $122.4 million preferential buyer's credit loan for Section 1 of Medan Kuala Namu Toll Road Project (Linked to Project ID#69125)

Commitment amount

$ 143747845.04811168

Adjusted commitment amount

$ 143747845.05

Constant 2021 USD

Summary

Funding agency [Type]

Export-Import Bank of China (China Eximbank) [State-owned Policy Bank]

Recipient

Indonesia

Sector

Transport and storage (Code: 210)

Flow type

Loan

Level of public liability

Central government debt

Infrastructure

Yes

Category

Intent

Mixed (The next section lists the possible statuses.)

Commercial

Development

Representational

Mixed

Financial Flow Classification

OOF-like (The next section lists the possible statuses.)

Official Development Assistance

Other Official Flows

Vague (Official Finance)

Flows categorized based on OECD-DAC guidelines

Project lifecycle

Status

Completion (The next section lists the possible statuses.)

Pledge

Commitment

Implementation

Completion

Suspended

Cancelled

Milestones

Commitment

2012-11-12

Actual start

2012-11-07

Actual complete

2018-08-01

Geography

Description

On November 12, 2012, China Exim Bank and the Ministry of Public Works and Public Housing of the Republic of Indonesia signed a $122,429,913 preferential buyer's credit (PBC) agreement [CHINA EXIMBANK PBC NO. 2012 (44) TOTAL NO. (232)] for Section 1 of the Medan Kuala Namu Toll Road Project (captured in Project ID#61427). Then, on January 23, 2017, the face value of the PBC was increased by 120 billion IDR — from 1.22 trillion IDR to 1.34 trillion IDR — after Indonesia’s Directorate General Of Budget Financing and Risk Management (Ditjen Pengelolaan Pembiayaan dan Risiko/PPR) countersigned an amendment letter (as captured in Project ID#69125). The PBC carries the following borrowing terms: an interest rate of 3%, a 0.2% management fee, a grace period of 5 years, and a maturity period of 15 years. The proceeds of the PBC were to be used by the borrower to partially finance a $150 million EPC contract with JO CHEC-CSCEC-HK, a joint venture of China Harbor Engineering Company (CHEC), China State Construction Engineering Corporation (CSCEC), and an Indonesia state-owned company called PT.Hutama Karya (Persero). The purpose of this project was to construct Section 1 of the Medan–Kuala Namu–Tebing Tinggi Toll Road (MKTT toll road), which is an expressway that connects Medan, Kualanamu International Airport and Tebing Tinggi, in Sumatra. The expressway (toll road), which was built in two sections, is part of the Trans-Sumatra Toll Road Network and it connects the industrial area in Medan, Kualanamu International Airport, Kuala Tanjung Port, Sei Mangkei Special Economic Zone and the access to Lake Toba. Section 1 is a 17.8 km highway segment — with four overpasses, eight mainline bridges, one overline bridge, three toll stations and a highway administration office building — that runs from Medan to Kuala Namu via Perbarakan. Section 2 is a 44 km segment that runs from Perbarakan to Tebing Tingg. JO CHEC-CSCEC-HK was the contractor responsible for project implementation. The project as a whole officially commenced on November 7, 2012. Then, on September 23, 2014, a foundation laying ceremony took place for Section 1. A partial road inauguration ceremony was held on October 13, 2017. However, Section 1 was not operational and opened to traffic until August 2018. On March 11, 2018, the PBC agreement was completed, and based on Article 3.3 in the agreement, the remaining undisbursed funds (worth $22.90 million), were automatically canceled.

Additional details

1. This project is also known as Section 1 of the 60.8 km Medan-Kualanamu Toll Road Project, Section 1 of the the Medan–Kuala Namu–Tebing Tinggi Toll Road, or Section 1 of the MKTT Toll Road Project. The Chinese project title is 印尼棉兰—瓜拉那姆机场高速公路项目.

Number of official sources

7

Number of total sources

9

Download the dataset

Details

Cofinanced

No

Direct receiving agencies [Type]

Government of Indonesia [Government Agency]

Implementing agencies [Type]

Indonesia Ministry of Public Works and Housing [Government Agency]

JO CHEC-CSCEC-HK [Joint Venture/Special Purpose Vehicle]

China Harbour Engineering Co., Ltd. [State-owned Company]

China State Construction Engineering Corporation (CSCEC) [State-owned Company]

PT.Hutama Karya (Persero) [State-owned Company]

Loan Details

Maturity

15 years

Interest rate

3.0%

Grace period

5 years

Grant element (OECD Grant-Equiv)

27.1264%

Bilateral loan

Export buyer's credit

Investment project loan

Preferential Buyer's Credit