Narrative
Full Description
Project narrative
In April 2000, China agreed to send the 10th Technical Cooperation Group to Equatorial Guinea to provide technical assistance at the Bicomo (Bikomo) Hydropower Station. In addition to technical support, the group also provided technical training to Equatorial Guineans. The 9th Technical Cooperation Group ended its work in April 2000, and the 10th Cooperation Group began its work in May 2000. The Bicomo Hydropower Station was first funded by China in 1983, and China Railway 14th Bureau Group was the contractor. Bicomo Hydropower Station is located near Bata, on the road that connects the towns of Nkue and Mongomo (also in the mainland), the telecommunications buildings of Malabo and Bata, and the Radio Equatorial station (in Bata).