China Eximbank provides $176.4 million preferential buyer's credit for Phase 2 of the 230 KV Loop Transmission Line Project (Eastern Loop Line Part I) (Linked to Record ID#62340, #62335, #62321)

Commitments (Constant USD, 2023)$177,601,704
Commitment Year2018Country of ActivityCambodiaDirect Recipient Country of IncorporationCambodiaSectorEnergyFlow TypeLoan

Status

Project lifecycle

Completion

Pipeline: PledgePipeline: CommitmentImplementationCompletion

Timeline

Key dates

Commitment date
Jan 11, 2018
Start (actual)
Mar 3, 2018
End (planned)
Mar 3, 2021
End (actual)
Feb 3, 2021
First repayment (originally scheduled)
Jan 9, 2025
Last repayment (originally scheduled)
Jan 6, 2038

Stakeholders

Organizations involved in projects and activities supported by financial and in-kind transfers from Chinese government and state-owned entities

Ultimate beneficial owners

At least 25% host country ownership

Funding agencies

State-owned Policy Banks

  • Export-Import Bank of China (China Eximbank)

Receiving agencies

Government Agencies

  • Cambodian Ministry of Economy and Finance

Implementing agencies

Government Agencies

  • Electricite du Cambodge

State-owned companies

  • China National Heavy Machinery Corporation (CHMC)

Loan description

China Eximbank provides $176.4 million preferential buyer's credit for Phase 2 of the 230 KV Loop Transmission Line Project (Eastern Loop Line Part I)

Grace period7 yearsGrant element56.0077%Interest rate (t₀)2%Interest typeFixed Interest RateMaturity20 years

Narrative

Full Description

Project narrative

On January 11, 2018, China Eximbank and the Government of Cambodia signed a $176,490,468 preferential buyer's credit (PBC) agreement for Phase 2 of the 230 KV Loop Transmission Line Project (Eastern Loop Line Part I). The PBC carried the following terms: a 20-year maturity, a 7-year grace period, and a 2% interest rate. The proceeds of the PBC were to be used by the borrower to finance an EPC (commercial) contract between Electricite du Cambodge (EDC) — the country’s state-owned electricity utility — and China National Heavy Machinery Corporation (CHMC), which was signed on October 13, 2016. According to the Government of Cambodia’s ODA Database, China Eximbank made three loan disbursements between 2019 and 2021: a $61,771,664 loan disbursement in 2019, a $52,947,140 loan disbursement in 2020, and a $61,771,664 loan disbursement in 2021. Phase 2 of the 230 kV Loop Transmission Line Project was implemented in two parts and was financed with two separate China Eximbank loans. Part I is captured via Record ID#62337, and Part II is captured via Record ID#62340. Phase 2 of the 230 kV Loop Transmission Line Project involved the construction of two new 50MW substations and the construction of a 230kV transmission line across four provinces in northeastern Cambodia (Stung Treng, Rattanakkiri, Kratie, and Mondulkiri) with a total length of about 275 kilometers. CHMC was the EPC contractor responsible for implementation. The project officially commenced on March 3, 2018, and construction was originally expected to last 36 months (estimated completion date: March 3, 2021). The transmission line was put into operation and officially commissioned on July 2, 2020. The project was ultimately completed on or around February 3, 2021.

Staff comments

1. This project is also known as the Cambodia State Grid 230kV Transmission and Transformation Phase Ⅱ Project (The First Part of the East Loop Line), the North Line of CHMC Cambodian East Loop Net (Phase Ⅰ) 230kV Electricity Transmission and Transformation Project, or the Cambodia Eastern Loop-Line Power Transmission Line Phase I Project. The Chinese project title is 柬埔寨国家电网230KV输变电工程二期项目(西南环网和东部环网剩余部分. 2. In the China’s Overseas Development Finance Dataset that Boston University's Global Development Policy Center published in December 2020, it identifies the loan commitment year as 2017 (rather than 2018) and the face value of the loan as $180 million (rather than $176,490,468). AidData relies upon the loan commitment year and face value of the loan that is reported by the borrower (the Government of Cambodia) itself. 3 One source suggests that project implementation commenced on December 19, 2017 rather than March 3, 2018. This issue merits further investigation. 4. Phase I of the 230 kV Loop Transmission Line Project is captured via Record ID#62335.