China Eximbank provides $176.4 million preferential buyer's credit for Phase 2 of the 230 KV Loop Transmission Line Project (Eastern Loop Line Part I) (Linked to Project ID#62340, #62335, #62321)
Commitment amount
$ 192348092.05278966
Adjusted commitment amount
$ 192348092.05
Constant 2021 USD
Summary
Funding agency [Type]
Export-Import Bank of China (China Eximbank) [State-owned Policy Bank]
Recipient
Cambodia
Sector
Energy (Code: 230)
Flow type
Loan
Level of public liability
Central government debt
Infrastructure
Yes
Category
Project lifecycle
Description
On January 11, 2018, China Eximbank and the Government of Cambodia signed a $176,490,468 preferential buyer's credit (PBC) agreement for Phase 2 of the 230 KV Loop Transmission Line Project (Eastern Loop Line Part I). The PBC carried the following terms: a 20-year maturity, a 7-year grace period, and a 2% interest rate. The proceeds of the PBC were to be used by the borrower to finance an EPC (commercial) contract between Electricite du Cambodge (EDC) — the country’s state-owned electricity utility — and China National Heavy Machinery Corporation (CHMC), which was signed on October 13, 2016. According to the Government of Cambodia’s ODA Database, China Eximbank made three loan disbursements between 2019 and 2021: a $61,771,664 loan disbursement in 2019, a $52,947,140 loan disbursement in 2020, and a $61,771,664 loan disbursement in 2021. Phase 2 of the 230 kV Loop Transmission Line Project was implemented in two parts and was financed with two separate China Eximbank loans. Part I is captured via Project ID#62337, and Part II is captured via Project ID#62340. Phase 2 of the 230 kV Loop Transmission Line Project involved the construction of two new 50MW substations and the construction of a 230kV transmission line across four provinces in northeastern Cambodia (Stung Treng, Rattanakkiri, Kratie, and Mondulkiri) with a total length of about 275 kilometers. CHMC was the EPC contractor responsible for implementation. The project officially commenced on March 3, 2018, and construction was originally expected to last 36 months (estimated completion date: March 3, 2021). The transmission line was put into operation and officially commissioned on July 2, 2020. The project was ultimately completed on or around February 3, 2021.
Additional details
1. This project is also known as the Cambodia State Grid 230kV Transmission and Transformation Phase Ⅱ Project (The First Part of the East Loop Line), the North Line of CHMC Cambodian East Loop Net (Phase Ⅰ) 230kV Electricity Transmission and Transformation Project, or the Cambodia Eastern Loop-Line Power Transmission Line Phase I Project. The Chinese project title is 柬埔寨国家电网230KV输变电工程二期项目(西南环网和东部环网剩余部分. 2. In the China’s Overseas Development Finance Dataset that Boston University's Global Development Policy Center published in December 2020, it identifies the loan commitment year as 2017 (rather than 2018) and the face value of the loan as $180 million (rather than $176,490,468). AidData relies upon the loan commitment year and face value of the loan that is reported by the borrower (the Government of Cambodia) itself. 3 One source suggests that project implementation commenced on December 19, 2017 rather than March 3, 2018. This issue merits further investigation. 4. Phase I of the 230 kV Loop Transmission Line Project is captured via Project ID#62335.
Number of official sources
12
Number of total sources
18
Details
Cofinanced
No
Direct receiving agencies [Type]
Cambodian Ministry of Economy and Finance [Government Agency]
Implementing agencies [Type]
Electricite du Cambodge [Government Agency]
China National Heavy Machinery Corporation (CHMC) [State-owned Company]
Loan Details
Maturity
20 years
Interest rate
2.0%
Grace period
7 years
Grant element (OECD Grant-Equiv)
51.7588%