Narrative
Full Description
Project narrative
On April 22, 2011, the second phase of the training program for the power transmission and transformation project of the Djibloho Hydropower Station began. The training was scheduled to last for 15 months, with a 9-month internship following the training in Anhui Electrical Engineering Professional Technique College(在安徽电气工程职业技术学院). The training included equipment installation, system operation, personnel safety, and troubleshooting and was put on by CMEC.