Project ID: 63630

China Eximbank pledges a loan for the 230 kV Sekong-Saphaothong Power Transmission Line Project

Not recommended for aggregates

This project is not recommended for use in creating aggregated sums. See the documentation for more information about this criteria.

Summary

Funding agency [Type]

Export-Import Bank of China (China Eximbank) [State-owned Policy Bank]

Recipient

Laos

Sector

Energy (Code: 230)

Flow type

Loan

Level of public liability

Other public sector debt

Infrastructure

Yes

Category

Intent

Development (The next section lists the possible statuses.)

Commercial

Development

Representational

Mixed

Financial Flow Classification

Vague (Official Finance) (The next section lists the possible statuses.)

Official Development Assistance

Other Official Flows

Vague (Official Finance)

Flows categorized based on OECD-DAC guidelines

Project lifecycle

Status

Pipeline: Pledge (The next section lists the possible statuses.)

Pledge

Commitment

Implementation

Completion

Suspended

Cancelled

Milestones

Commitment

2017-01-01

Planned start

2018-01-01

Planned complete

2020-01-01

Description

According to a 2017 report by Asian Development Bank, the Export-Import Bank of China was expected to finance 230 kV Sekong-Saphaothong Power Transmission Line Project, a 109 kilometer long (218 circuit kilometers long) transmission line from Sekong to Saphaothong. The project period was expected to be between 2018 and 2020, with the Commercial Operation Date (COD) expected to fall in 2020. Laos' state-owned power company, Électricité du Laos (EDL), was expected to be the owner of the transmission line. As of 2017, this project was under a feasibility study.

Additional details

AidData has assumed China Eximbank offered a pledge or some other unofficial promise to finance this project, as the Asian Development Bank (ADB) marks them as the funding agency for this project, even though no official agreement appears to have been signed. However, it is unclear whether China Eximbank was also responsible for financing feasibility study. It is also unclear when China Eximbank offered its pledge; AidData has coded 2017 as the commitment year and checked the commitment_field_year_estimated? field because this is the year of the ADB report that first identified the project. These issues merit further investigation.

Number of official sources

1

Number of total sources

1

Download the dataset

Details

Cofinanced

No

Direct receiving agencies [Type]

Électricité du Laos (EDL) [State-owned Company]

Loan Details

Bilateral loan

Investment project loan