China Eximbank pledges $17.48 million loan for 30MW Upper Baluchaung Hydropower Plant Project

Commitments (Constant USD, 2023)$18,287,548
Commitment Year2015Country of ActivityMyanmarDirect Recipient Country of IncorporationMyanmarSectorEnergyFlow TypeLoan

Status

Project lifecycle

Pipeline: Pledge

Pipeline: PledgePipeline: CommitmentImplementationCompletion

Timeline

Key dates

Commitment date
Nov 4, 2015
Last repayment (originally scheduled)
Dec 27, 2034

Stakeholders

Organizations involved in projects and activities supported by financial and in-kind transfers from Chinese government and state-owned entities

Ultimate beneficial owners

At least 25% host country ownership

Funding agencies

State-owned Policy Banks

  • Export-Import Bank of China (China Eximbank)

Receiving agencies

Government Agencies

  • Myanmar Ministry of Electric Power (MOEP)

Implementing agencies

State-owned companies

  • China National Heavy Machinery Corporation (CHMC)

Loan description

China Eximbank pledges $17.48 million loan for 30MW Upper Baluchaung Hydropower Plant Project

Interest typeUnknownMaturity20 years

Narrative

Full Description

Project narrative

In 2011, a Build-Operate-Transfer (BOT) contract was signed for the 30MW Upper Beluchaung Hydropower Plant. In May 2011, China Eximbank also reportedly agreed to issue a $17.48 million loan for the 30MW Upper Baluchaung Hydropower Plant. According to page 2-171 of the release from the Final Report to Yangon, the loan may have been interest-free with a maturity period of 20 years. However in 2013, the project was suspended due to financing problems. The project was later re-started with a loan from a Myanmar state-owned bank, with the Government of Myanmar holding a 40% stake in the project. A financing request for this project was reportedly submitted to China Eximbank under a cooperation fund in 2015. However, it is unclear if the request was approved. Then, on November 4, 2015, China National Heavy Machinery Corporation (CHMC) and Myanmar Ministry of Electric Power (MOEP) signed an EPC contract for the 30MW Upper Baluchaung Hydropower Plant. Representatives from China Eximbank attended the EPC contract signing ceremony, and it was said that "The financing will be integrated into the sum of cooperation requested by Burma from the Exim Bank". The purpose of the project is to construct a 30MW hydroelectric power plant — with two, 15MW power generation units (Unit 1 and Unit 2) — Nyaungshwe Township within the upper reaches of the Baluchaung River upstream of the Mobye Dam. The project scope includes the construction of a 35 meter high dam, which will create a reservoir that will inundate 10 km2 and store 2.2 hm3. A 2.6 km long headrace canal will lead to a penstock 266 meter long connecting to two Francis turbines in an above-ground powerhouse. A 32 km 66 kV transmission line will connect the power plant to the Kalaw substation. The expected duration of the project implementation period is 28 months. This project is also known as the 30MW Upper Beluchaung Hydropower Plant or the 2x15MW Upper Beluchaung Hydropower Plant. The Chinese project title is 就上巴路桥水电站EPC项目 or 缅甸上巴路桥水电站.

Staff comments

This project is status-coded as a pledge because it is not known if China Eximbank ever issued the loan pledged for this project.