Narrative
Full Description
Project narrative
In 2013, the Chinese Government provided a grant to the Government of Guinea for the Presidential Palace Maintenance and Reconstruction Project. The monetary value of this grant commitment is unknown. This project involved renovations to the existing presidential palace (known as Palais Sékouturéa or Palais Présidentiel Sékhoutouréya) and the construction of a new administrative office building in a 1,143 square meter area. Shanghai Construction Group was the contractor responsible for implementation. Construction began on May 18, 2013 and ended in April 2014. During the 1990s, the Chinese Government financed the construction of the presidential palace. The contractor responsible for the construction of the palace was Gansu Construction Engineering Group. In 2015, China carried out the People’s Palace and Presidential Palace Technical Cooperation Project (see Record ID#73894).
Staff comments
The French project title is Palais Sékouturéa or Le Palais Présidentiel Sékhoutouréya or La Mission de Coopération Technique Chinoise du Palais Présidentiel. The Chinese project title is 几内亚总统府 or 援几内亚总统府项目.