Project ID: 64621

China Eximbank provides $14.4 million seller's credit for 60MW al-Hiswa Power Station Expansion Project (Linked to Project ID#64650)

Commitment amount

$ 35079317.86145094

Adjusted commitment amount

$ 35079317.86

Constant 2021 USD

Summary

Funding agency [Type]

Export-Import Bank of China (China Eximbank) [State-owned Policy Bank]

Recipient

Yemen

Sector

Energy (Code: 230)

Flow type

Loan

Level of public liability

Central government debt

Infrastructure

Yes

Category

Intent

Mixed (The next section lists the possible statuses.)

Commercial

Development

Representational

Mixed

Financial Flow Classification

OOF-like (The next section lists the possible statuses.)

Official Development Assistance

Other Official Flows

Vague (Official Finance)

Flows categorized based on OECD-DAC guidelines

Project lifecycle

Status

Completion (The next section lists the possible statuses.)

Pledge

Commitment

Implementation

Completion

Suspended

Cancelled

Milestones

Commitment

2003-04-16

Actual start

2003-10-19

Planned complete

2005-10-19

Geography

Description

On April 16, 2003, China Machinery Engineering Corporation (CMEC) and the Government of Yemen’s Ministry of Planning and International Cooperation signed a $14.4 million supplier credit (vendor financing) agreement for the 60MW al-Hiswa Power Station Expansion Project. The borrowing terms of the supplier’s credit, which CMEC provided with support from an export seller’s credit from China Eximbank, are unknown. The borrower was to use the proceeds from the supplier credit to finance approximately 80% of the $18 million cost of an EPC contract with CMEC. The project involved the reconstruction and expansion of the 60MW al-Hiswa Power Station (哈斯瓦电站 or محطة الحسوة الأيام or محطة الحسوة البخارية) near the port city of Aden. The EPC contract, which was signed on signed on April 16, 2003, went into force on October 19, 2003. The project was originally supposed to reach completion by October 19, 2005. However, the implementation period was extended in November 2005 and given a new end date of March 18, 2006. The expanded power plant was ultimately expected to go into operation in March 2007. The project appears to have reached completion in 2008; however, its precise completion date is unknown. CMEC also provided a supplier credit for the 132 kV al-Hiswa-Khormakser Transmission and Transformation Project (captured in Project ID#64650).

Additional details

1. This project is also known was the 1x60 MW al-Hiswa Power Station Extension Project. The Chinese project title is 哈斯瓦(HISWA)电站一期扩建工. The Arabic project title is توسعة مشروع كهرباء محطة الحسوة بعدن or مشروع توسعة محطة الحسوة الكهروحرارية بقدر 60 ميجاوات: or إعادة تأهيل محطة الحسوة.

Number of official sources

6

Number of total sources

13

Download the dataset

Details

Cofinanced

No

Direct receiving agencies [Type]

Yemen Ministry of Planning and International Cooperation [Government Agency]

Indirect receiving agencies [Type]

China Machinery Engineering Corporation (CMEC) [State-owned Company]

Implementing agencies [Type]

China Machinery Engineering Corporation (CMEC) [State-owned Company]

Loan Details

Bilateral loan

Investment project loan

Supplier's credit/Export seller's credit