China Eximbank provides $14.4 million seller's credit for 60MW al-Hiswa Power Station Expansion Project (Linked to Record ID#64650)

Commitments (Constant USD, 2023)$32,400,503
Commitment Year2003Country of ActivityYemenDirect Recipient Country of IncorporationYemenSectorEnergyFlow TypeLoan

Status

Project lifecycle

Completion

Pipeline: PledgePipeline: CommitmentImplementationCompletion

Timeline

Key dates

Commitment date
Apr 16, 2003
Start (actual)
Oct 19, 2003
End (planned)
Oct 19, 2005

Geospatial footprint

Map overview

Visualizes the AidData-provided feature geometry for this project.

Loading map…

This project involved the reconstruction and expansion of the 60MW al-Hiswa Power Station (哈斯瓦电站 or محطة الحسوة الأيام or محطة الحسوة البخارية) near the port city of Aden. More detailed locational information can be found at https://www.openstreetmap.org/way/121834063.

Stakeholders

Organizations involved in projects and activities supported by financial and in-kind transfers from Chinese government and state-owned entities

Ultimate beneficial owners

At least 25% host country ownership

Funding agencies

State-owned Policy Banks

  • Export-Import Bank of China (China Eximbank)

Receiving agencies

Government Agencies

  • Yemen Ministry of Planning and International Cooperation

State-owned companies

  • China Machinery Engineering Corporation (CMEC)

Implementing agencies

State-owned companies

  • China Machinery Engineering Corporation (CMEC)

Loan desecription

China Eximbank provides $14.4 million seller's credit for 60MW al-Hiswa Power Station Expansion Project

Interest typeUnknown

Narrative

Full Description

Project narrative

On April 16, 2003, China Machinery Engineering Corporation (CMEC) and the Government of Yemen’s Ministry of Planning and International Cooperation signed a $14.4 million supplier credit (vendor financing) agreement for the 60MW al-Hiswa Power Station Expansion Project. The borrowing terms of the supplier’s credit, which CMEC provided with support from an export seller’s credit from China Eximbank, are unknown. The borrower was to use the proceeds from the supplier credit to finance approximately 80% of the $18 million cost of an EPC contract with CMEC. The project involved the reconstruction and expansion of the 60MW al-Hiswa Power Station (哈斯瓦电站 or محطة الحسوة الأيام or محطة الحسوة البخارية) near the port city of Aden. The EPC contract, which was signed on signed on April 16, 2003, went into force on October 19, 2003. The project was originally supposed to reach completion by October 19, 2005. However, the implementation period was extended in November 2005 and given a new end date of March 18, 2006. The expanded power plant was ultimately expected to go into operation in March 2007. The project appears to have reached completion in 2008; however, its precise completion date is unknown. CMEC also provided a supplier credit for the 132 kV al-Hiswa-Khormakser Transmission and Transformation Project (captured in Record ID#64650).

Staff comments

1. This project is also known was the 1x60 MW al-Hiswa Power Station Extension Project. The Chinese project title is 哈斯瓦(HISWA)电站一期扩建工. The Arabic project title is توسعة مشروع كهرباء محطة الحسوة بعدن or مشروع توسعة محطة الحسوة الكهروحرارية بقدر 60 ميجاوات: or إعادة تأهيل محطة الحسوة.