Project ID: 64663

Chinese Government provides RMB 52 million grant for Lao National Television (LNTV) Channel 3 Reconstruction Project (Linked to Project ID#64693, #64690)

Commitment amount

$ 8867489.333317315

Adjusted commitment amount

$ 8867489.33

Constant 2021 USD

Summary

Funding agency [Type]

China Ministry of Commerce [Government Agency]

Recipient

Laos

Sector

Communications (Code: 220)

Flow type

Grant

Infrastructure

No

Category

Intent

Development (The next section lists the possible statuses.)

Commercial

Development

Representational

Mixed

Financial Flow Classification

ODA-like (The next section lists the possible statuses.)

Official Development Assistance

Other Official Flows

Vague (Official Finance)

Flows categorized based on OECD-DAC guidelines

Project lifecycle

Status

Completion (The next section lists the possible statuses.)

Pledge

Commitment

Implementation

Completion

Suspended

Cancelled

Milestones

Commitment

2017-08-10

Actual start

2018-12-10

Actual complete

2019-08-09

Geography

Description

On March 16, 2017, a feasibility study for the Lao National Television (LNTV) Channel 3 Reconstruction Project was completed. Then, on August 10, 2017, the Chinese Government and the Government of Laos signed a grant agreement for the Lao National Television (LNTV) Channel 3 Reconstruction Project. China’s Ministry of Commerce committed approximately RMB 52 million (70 billion kip) of grant funding or the project. The grant proceeds were to be used by the Government of Laos to finance an EPC contract, which was signed on January 6, 2018. The purpose of this project was to give Lao National Television (LNTV), which is located in the capital city of Vientiane, the ability to produce high-definition (HD) programs. It involved the upgrading and transformation of its studios, editing systems, transmission and conversion systems. It also involved the provision of high-definition studio vehicles, portable transmission equipment, and a 3-year period of technical cooperation. Jiangsu Jiangdu Construction Group Co., Ltd. and Beijing Century Sage Scientific Co., Ltd. were the contractors responsible for implementation. They works in close coordination with LNTV and China’s Radio-Film & Television Design & Research Institute. The project commenced on December 10, 2018. Then, a formal commencement ceremony took place on February 28, 2019. The project was completed on August 9, 2019 and a formal handover ceremony took place on September 6, 2019. Deputy Minister of Information, Culture and Tourism, Mr Savankhone Razmountry, Director General of Lao National Television, Mr Bounchao Phichit, Counsellor of the Economic and Commercial Counsellor’s Office at the Chinese Embassy to Laos, Mr Wang Qihui, and officials from both countries attended the handover ceremony. Project #64693 codes Stage 1 of the project, and #64690 codes Stage 2.

Additional details

This project is also known as the LNTV HD Upgrade Project and the Channel 3 System Upgrade Project. The Chinese project title is 援老挝国家电视台3频道技术合作项目. This project is the third phase of a larger project (captured in Umbrella Project ID#64191).

Number of official sources

3

Number of total sources

8

Download the dataset

Details

Cofinanced

No

Direct receiving agencies [Type]

Government of Laos [Government Agency]

Indirect receiving agencies [Type]

Lao National Television (LNTV) [Miscellaneous Agency Type]

Implementing agencies [Type]

Beijing Century Ruike System Technology Co., Ltd. [State-owned Company]

Jiangsu Jiangdu Construction Group Co., Ltd. [State-owned Company]