Chinese Government provides a $500,000 USD grant for the reconstruction of the Nahr el-Bared Camp (Linked to Record ID#65641)

Commitments (Constant USD, 2023)$693,659
Commitment Year2009Country of ActivityLebanonDirect Recipient Country of IncorporationLebanonSectorReconstruction Relief And RehabilitationFlow TypeGrant

Status

Project lifecycle

Completion

Pipeline: PledgePipeline: CommitmentImplementationCompletion

Timeline

Key dates

Commitment date
Apr 27, 2009
Start (actual)
Nov 1, 2009
End (actual)
Apr 27, 2009

Geospatial footprint

Map overview

Visualizes the AidData-provided feature geometry for this project.

Loading map…

This project took place in the Nahr al-Bared (Arabic: نهر البارد‎) refugee camp in northern Lebanon, 16 km from the city of Tripoli. More detailed locational information can be found at https://www.openstreetmap.org/way/927429440 and https://www.geonames.org/276979/nahr-el-bared.html.

Stakeholders

Organizations involved in projects and activities supported by financial and in-kind transfers from Chinese government and state-owned entities

Funding agencies

Government Agencies

  • Unspecified Chinese Government Institution

Receiving agencies

Government Agencies

  • Government of Lebanon

Implementing agencies

Government Agencies

  • Lebanese Council for Development and Reconstruction (CDR)

Loan desecription

Chinese Government provides a $500,000 USD grant for the reconstruction of the Nahr el-Bared Camp (Linked to Record ID#65641)

Narrative

Full Description

Project narrative

According to a 2009 Lebanese Ministry of Finance Aid Coordination Newsletter, on April 27, 2009, the Council of Ministers approved two grants from China: $500,000 USD for reconstruction and land expropriation of the Nahr el-Bared Palestinian Camp and $680,000 USD through UNRWA for the rehabilitation of Palestinian camps in Lebanon (see linked Record ID#65641). The land expropriation will be implemented through the Lebanese Council for Development and Reconstruction (CDR). The total estimated cost of reconstructing the Nahr el-Bared Camp was $345 million USD, of which $188 million USD had been secured as of 2014. The project involves the reconstruction of residential units for 4,867 families, 1,105 shops, the UNRWA Compound, and all camp infrastructure. The physical reconstruction of NBC commenced in November 2009 following the removal of over 500,000 cubic meters of rubble and the successful clearance of over 12,500 unexploded ordinances (UXOs). The reconstruction was divided into 8 Packages. As of 2014, all of Package 1 and most of Package 2 has been completed and handed over, three of the Blocks in Package 3 are completed, three are underway and the remaining block will be commencing in early 2014. In Package 4, which is fully funded, work has commenced on six of the eight Blocks, with the remaining two to commence soon after. Package 5 is currently at the design stage and funding for this and the other three remaining Packages is currently being sought.

Staff comments

This project is known as "Contribution in the Expropriation for the Reconstruction of Nahr el Bared Camp, 2009" in the Lebanese Council for Development and Reconstruction's (CDR) database. The agreement number is 5909 (see "CDR Funding - Contribution in the Expropriation for the Reconstruction of Nahr el Bared Camp, 2009").