Narrative
Full Description
Project narrative
According to a 2015 Electric Power Industry of Serbia Annual Report, the People’s Republic of China donated a high-capacity pump to Elektroprivreda Srbije (EPS) — a Serbian state-owned power company — in order to support the implementation of Phase 1 and Phase 2 of Kostolac B Power Plant Project. China Eximbank financed Phases 1 and 2 of the Kostolac B Power Plant (see Record ID#42549 and ID#42555), which is located on the right bank of Danube river on the outskirts of the town of Kostolac, which is located within Kostolac Urban Municipality, Pozarevac City, and Branicevo Administrative District.
Staff comments
The grant commitment year is uncertain. For the time being, it is set to 2015 since the report that references the donation was published in 2015.