China Eximbank provides $445 million preferential buyer’s credit for Preljina-Pozega Section of the Highway E-763 Construction Project

Commitments (Constant USD, 2023)$461,904,433
Commitment Year2019Country of ActivitySerbiaDirect Recipient Country of IncorporationSerbiaSectorTransport And StorageFlow TypeLoan

Status

Project lifecycle

Implementation

Pipeline: PledgePipeline: CommitmentImplementationCompletion

Timeline

Key dates

Commitment date
Apr 25, 2019
Start (actual)
May 17, 2019
End (planned)
May 17, 2022
First repayment
May 15, 2024
Last repayment
May 15, 2039

Geospatial footprint

Map overview

Visualizes the AidData-provided feature geometry for this project.

Loading map…

The purpose of the project is to construct a 31 kilometer two-way four-lane highway, including 3 tunnels, 35 bridges, and 3 interchanges. The design speed of the highway is 120 km/h. The 31 km Preljina-Pozega section of the E763 highway is divided into three sections: (1) from Preljina to Prijevor along Cemernica River and in the small part of the Western Morava (up to 8.3 km); (2) paved roads from Prijevora to Lucani (15.51 km), 20 bridges (longer than 3 km), and the construction of Laz tunnel (1,750 meters); (3) from Lucani to Pozega (7 km), three bridges, a tunnel (2,040 m), a loop in Lucani, and a bridge over the river Bjelica. Nearly a third of the route on the future road segment from Preljina to Pozega is made up of planned bridges and tunnels. More detailed locational information can be found at: https://www.openstreetmap.org/directions?engine=fossgis_osrm_car&route=43.9211%2C20.3952%3B43.9109%2C20.2744#map=12/43.8701/20.3814, https://www.openstreetmap.org/way/918231688, https://www.openstreetmap.org/way/918231687, https://www.openstreetmap.org/way/839612558#map=14/43.8427/20.1909, https://www.openstreetmap.org/node/7833175821, https://www.openstreetmap.org/way/918231683, https://www.openstreetmap.org/way/918231684, https://www.openstreetmap.org/node/7832966713, https://www.openstreetmap.org/way/839387793, https://www.openstreetmap.org/node/7833102160, https://www.openstreetmap.org/way/1078024715

Stakeholders

Organizations involved in projects and activities supported by financial and in-kind transfers from Chinese government and state-owned entities

Ultimate beneficial owners

At least 25% host country ownership

Funding agencies

State-owned Policy Banks

  • Export-Import Bank of China (China Eximbank)

Receiving agencies

Government Agencies

  • Serbian Ministry of Finance

Implementing agencies

Government Agencies

  • National Bank of Serbia (NBS)

State-owned companies

  • China Communications Construction Co., Ltd. (CCCC)

Loan desecription

China Eximbank provides $445 million preferential buyer’s credit for Preljina-Pozega Section of the Highway E-763 Construction Project

Grace period5 yearsGrant element46.2598%Interest rate (t₀)3%Interest typeFixed Interest RateMaturity20 years

Narrative

Full Description

Project narrative

On September 6, 2018, the Government of the Republic of Serbia approved a $445 million preferential buyer's credit (loan) application to China Eximbank for the Preljina-Pozega Section of the Highway E-763 Construction Project. Then, on April 25, 2019, China Eximbank and the Government of the Republic of Serbia signed a $445 million preferential buyer's credit (PBC) agreement [CHINA EXIMBANK PBC NO. (2019) 2 TOTAL NO. (486)] for the Preljina-Pozega Section of the Highway E-763 Construction Project. The loan (PBC) carries the following borrowing terms: a 3% interest rate, a 0% default (penalty) interest rate, a 20-year maturity, a 5-year grace period, a 0.5% commitment fee, and a 0.5% ($2,225,000.00) management fee. The proceeds of the PBC were to be used by the borrower to finance 85% of the cost of a $523,530,000 commercial contract (#401-00-829/2017-01) between the Government of the Republic of Serbia, Public Enterprise "Roads of Serbia”, and China Communications Construction Company Ltd., which was signed on November 27, 2017. The lender made disbursements worth $89,000,000 in 2019, $5,840,000 in 2020, and $63,040,000 in 2021. The loan’s (principal) amount outstanding was $89,000,000 as of December 31, 2019, $94,840,000 as of December 31, 2020, $157,880,000 as of December 31, 2021, and $250,542,000 as of September 31, 2022. The purpose of the project is to construct a 31 kilometer two-way four-lane highway, including 3 tunnels, 35 bridges, and 3 interchanges. The design speed of the highway is 120 km/h. The 31 km Preljina-Pozega section of the E763 highway is divided into three sections: (1) from Preljina to Prijevor along Cemernica River and in the small part of the Western Morava (up to 8.3 km); (2) paved roads from Prijevora to Lucani (15.51 km), 20 bridges (longer than 3 km), and the construction of Laz tunnel (1,750 meters); (3) from Lucani to Pozega (7 km), three bridges, a tunnel (2,040 m), a loop in Lucani, and a bridge over the river Bjelica. Nearly a third of the route on the future road segment from Preljina to Pozega is made up of planned bridges and tunnels. The larger E-763 highway will stretch for more than 250 kilometers from Belgrade to the country’s border with Montenegro. China Communications Construction Company Ltd. is the EPC contractor responsible for implementation. Construction began on May 17, 2019 and the project was expected to reach completion within 3 years (May 17, 2022). The President of Serbia conducted an on-site project inspection on June 12, 2020.

Staff comments

1. This project is also known as the Construction of the Preljina-Pozega Section of the Belgrade-South Adriatic-Corridor XI Project, the Construction of the Preljina-Pozega Section of the Highway E-763 Project, and the Construction of the Highway E-763, Preljina-Pozega Section Project. The Chinese project title is E763高速普雷利纳—波热加段 or E763高速公路项目等由. The Serbian project title is Projekat izgradnje autoputa E-763, deonica Preljina−Požega. 2. This $445 million China Eximbank loan is not recorded the China’s Overseas Development Finance Dataset, which Boston University's Global Development Policy Center published in December 2020. 3. The China Eximbank PBC (loan) agreement [CHINA EXIMBANK PBC NO. (2019) 2 TOTAL NO. (486)] can be accessed in its entirety via https://www.documentcloud.org/documents/20488788-ser_2019_477. 4. The November 27, 2017 commercial contract can be accessed in its entirety via https://www.dropbox.com/s/5y3irzwl9g252it/Ugovor_E-763_Preljina_-_Pozega%20Commercial%20Contract.pdf?dl=0.